contract agreement · K-4

K-4 - Change Order 15, Rathje Construction - Original Town Phase Two

Open the PDF Searchable (OCR) PDF

Page 3 of 3

Text read by the vision model; check the PDF for anything that matters.
Dan Scofield From: Curt Richey <[email protected]> Sent: Monday, February 7, 2022 10:45 AM To: Dan Scofield Cc: Amanda Andrews Subject: RE: pavers for Tiffin Phase 3 Dan- Below is the requested pricing to furnish the pavers to the city of Tiffin for a future phase. The quantity is based on Ben’s qty from below with a waste factor of ~5% and adjusted to full bundles. The city will need to have adequate laydown for 83 Bundles (pallets) of material, depending on surface these can be double, or triple stacked. The manufacturer currently has production for the current phase scheduled to start February 15th. Ideally, we would add this to the existing order. <table> <tr> <th>Item #</th> <th>Description</th> <th>Qty</th> <th>Unit</th> <th>Unit Cost</th> <th>Co</th> </tr> <tr> <td>NA</td> <td>Brick Paver Furnish ONLY</td> <td>686.54</td> <td>SY</td> <td>$61.29</td> <td>$42,078.2</td> </tr> </table> Curt Richey|Project Manager 805 Vernon Valley Dr Cedar Rapids, IA 52403 PH: 319-377-5064 FAX: 319-377-5536 CELL: 319-899-0004 www.hardscapesolutions.net From: [email protected] <[email protected]> Sent: Wednesday, February 2, 2022 10:23 AM To: Curt Richey <[email protected]> Cc: [email protected] Subject: RE: pavers for Tiffin Phase 3 I cannot speak for the City, but, I do not think they would have an issue with that. The goal is to secure enough bricks the third phase so the colors are from the same production lots as the bricks in Phase 2 Benjamin A. Carhoff, P.E. Hart-Frederick Consultants PC 510 State Street, PO Box 560 Tiffin, IA 52340-0560 P. 319-545-7215 F.319-545-7220 C.319-631-1081 [email protected] From: Curt Richey <[email protected]> Sent: Wednesday, February 2, 2022 10:18 AM To: [email protected] Cc: [email protected] Subject: RE: pavers for Tiffin Phase 3

Sources

  • sharepoint (K-4 - Change Order 15, Rathje Construction - Original Town Phase Two.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.