other · M-8

M-8 - CMReport - 2-11-22

Open the PDF

Page 1 of 1

Text from the PDF text layer; check the PDF for anything that matters.
______________________________________________________________________________ CITY OF TIFFIN CITY ADMINISTRATOR REPORT TO THE CITY COUNCIL February 11, 2022 • The preconstruction meeting for the Public Works Building has been scheduled for Tuesday afternoon at 2:00 p.m. I should have a schedule for the project at Tuesday’s meeting. • Shawver completed the test well at the water plant site and moved their equipment to the soccer field site late last week. After clearing the snow, they positioned the drill rig at the well site to begin work this week. They anticipate getting most of the casing set and grouted if all goes as planned. After installation of the casing, both wells will be tested. Shawver will then pull water quality test samples after test pumping. We should be able to get some of the more significant sample results relatively quickly with others taking several weeks to obtain. Shawver drilled the open hole into the Silurian formation on Thursday and should be able to complete most of work by Monday. The test pumping is tentatively scheduled towards the end of next week. • I’m sure most of you have already heard this but the North Liberty Leader will cease publication and this week’s issue was its final one. We are currently looking at other options for the City’s official newspaper. • Henderson Products contacted Brian Detert earlier this week to come and do a final inspection on the City’s dump truck. Everything went well and if their schedules holds, we should have the truck before Tuesday’s meeting. If that ends up being the case, Brian will have the truck in the parking lot for everyone to take a look at prior to the meeting. • Tiffin Rec Fest, with council consensus, will be scheduled for Saturday, July 23rd.

Sources

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.