plat site plan

WS - D - Madden Addition Lot 55 - OPD Site Plan

Open the PDF Searchable (OCR) PDF

Page 4 of 5

Text read by OCR; check the PDF for anything that matters.
VN CEDAR STAGGERED EDGE SIDING $B FASCIA 8/12 8/12 lum BUILDING SYSTEMS, LLC PLUM DESIGN SERVICES Hf 1100 SE ALICE'S ROAD. WAUKEE,IOWA $0263 FLR TELEPHONE 515978 6260 FAX 515978 6261 3RD \ S Third Fir Wall Hgt PLUM DESIGN SERVICE, INC. ASSUMES NO <a] 30'- 4 7/8" RESPONSIBILITY FOR STRUCTURAL OR FROM DIMENSIONAL ERRORS OR OMISSIONS. WE ARE 0 RCHITECT OR ENGINEER. HGT THESE PLANS ARE PROVIDED ON AN AS IS' HDR BASIS AND IT IS THE SOLE RESPONSIBILITY OF VERTICAL SIDINGS" 0.C NY 11/8" THE CONTRACTOR AND/OR OWNER TO VERIFY AND CHECK ALL NOTES, DETAILS, ELEVATIONS, 8'- SECTIONS, AND FLOOR PLANS PRIOR TO “WINDOW 1X12 TRIM BANDBOARD NY CONSTRUCTION. THE CONTRACTOR AND/OR J { & Third Floor OWNER SHALL NOTIFY PLUM DESIGN SERVICE, 22'-3 3/4 INC. IMMEDIATELY IF ANY ERRORS OR OMISSION FOR POSSIBLE CORRECTION ARE IDENTIFIED PRIOR TO START OF 2-03) \ & Second Fir Wall Hot CONSTRUCTION. NO WARRANTIES EXPRESS OR 20'- 3° IMPLIED INCLUDING COMPLIANCE WITH THIS PLAN WITH APPLICABLE BUILDING CODES REQUIREMENTS ARE MADE. 11/8" 9'- LAP SIDING W 7" REVEAL we MEMBER A\l { > Second Floor 1 1X6 TRIN GARAGE DOOR _ 11'-1 7/8" 8/12 2'-03/4" \ S First Fir Wall Hat B|/D. g-1 1/8" 11/8" AMERICAN INSTITUTE of 9+ BUILDING DESIGN ‘e First Floor 0-0" Creating where’people live ESTIMATED AREA - WALL CLADDING ¢ ) FRONT ELEVATION Scale: 3/6*= 1-0" MATERIAL | MATERIAL ELEVATION Front Front ‘STLAFE FOTN OF CATE SOONG IS TAA FFEM TE POE SRE CF EVAL, Builders TE FRM Home 4-Plex 8/12 8/12 8/12 Sweeting ' S Third Fir Wall Hgt 3-Story 30'- 47/8" Midwest Dan 11/8" PROJECT ID: s'- { & Third Floor PDS # 3322 22-3 3/4" 2-03/4" \ > Second Fir Wall Hgt ISSUE DATE: 20'- 3" DATE; (03-21-16 DATE: 05-02-16 DATE: 05-17-16 9'-11/8" 1 S Second Floor 11-1718" 03/4" 2'- \ S First Fir Wall Hat g-4 1/8" TTT Elevations 9-1/8" ze S First Floor 3/16" = 1'-0" IIIT . 0'-0" —NTITTTTTT. THIS PAGE 1S INTENDED TO BE PRINTED ON 24436" PAPER TO BE 10 SLALE 6 — 4-0 T.O. Footing - Overall @) REAR ELEVATION Seale: 3/16"= 1:0" A.1

Sources

  • sharepoint (WS - D - Madden Addition Lot 55 - OPD Site Plan.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.