plat site plan
WS - D - Madden Addition Lot 55 - OPD Site Plan
Page 4 of 5
Text read by OCR; check the PDF for anything that matters. VN
CEDAR STAGGERED EDGE SIDING
$B FASCIA
8/12 8/12
lum
BUILDING SYSTEMS, LLC
PLUM DESIGN SERVICES
Hf
1100
SE ALICE'S ROAD. WAUKEE,IOWA $0263
FLR
TELEPHONE 515978 6260 FAX 515978 6261
3RD
\ S Third
Fir Wall Hgt PLUM DESIGN SERVICE, INC. ASSUMES NO
<a] 30'- 4 7/8"
RESPONSIBILITY FOR STRUCTURAL
OR
FROM
DIMENSIONAL ERRORS OR OMISSIONS. WE ARE
0 RCHITECT OR ENGINEER.
HGT
THESE PLANS ARE PROVIDED ON AN AS IS'
HDR
BASIS AND IT IS THE SOLE RESPONSIBILITY OF
VERTICAL SIDINGS"
0.C NY
11/8"
THE CONTRACTOR AND/OR OWNER TO VERIFY
AND CHECK ALL NOTES, DETAILS, ELEVATIONS,
8'-
SECTIONS, AND FLOOR PLANS PRIOR TO
“WINDOW
1X12 TRIM BANDBOARD NY CONSTRUCTION. THE CONTRACTOR AND/OR
J
{ & Third Floor OWNER SHALL NOTIFY PLUM DESIGN SERVICE,
22'-3 3/4 INC. IMMEDIATELY IF ANY ERRORS OR
OMISSION FOR POSSIBLE CORRECTION ARE
IDENTIFIED PRIOR TO START OF
2-03)
\ & Second Fir Wall Hot CONSTRUCTION. NO WARRANTIES EXPRESS OR
20'- 3° IMPLIED INCLUDING COMPLIANCE WITH THIS
PLAN WITH APPLICABLE BUILDING CODES
REQUIREMENTS ARE MADE.
11/8"
9'-
LAP SIDING W 7" REVEAL we MEMBER
A\l
{ > Second Floor
1
1X6 TRIN GARAGE DOOR _ 11'-1 7/8"
8/12
2'-03/4"
\ S First Fir Wall Hat
B|/D.
g-1 1/8"
11/8"
AMERICAN INSTITUTE of
9+
BUILDING DESIGN
‘e First Floor
0-0"
Creating where’people live
ESTIMATED AREA - WALL CLADDING
¢ ) FRONT ELEVATION
Scale: 3/6*= 1-0" MATERIAL | MATERIAL
ELEVATION
Front
Front
‘STLAFE FOTN OF CATE SOONG IS TAA FFEM TE POE SRE CF EVAL,
Builders
TE
FRM
Home
4-Plex
8/12 8/12 8/12
Sweeting
' S Third Fir Wall Hgt
3-Story
30'- 47/8"
Midwest
Dan
11/8"
PROJECT ID:
s'-
{ & Third Floor PDS # 3322
22-3 3/4"
2-03/4"
\ > Second Fir Wall Hgt ISSUE DATE:
20'- 3"
DATE; (03-21-16
DATE: 05-02-16
DATE: 05-17-16
9'-11/8"
1 S Second Floor
11-1718"
03/4"
2'-
\ S First
Fir Wall Hat
g-4 1/8"
TTT
Elevations
9-1/8"
ze S First Floor 3/16" = 1'-0"
IIIT
. 0'-0"
—NTITTTTTT.
THIS PAGE 1S INTENDED TO BE PRINTED
ON
24436" PAPER TO BE 10 SLALE
6 — 4-0
T.O. Footing - Overall
@) REAR ELEVATION
Seale: 3/16"= 1:0"
A.1
Sources
- sharepoint (WS - D - Madden Addition Lot 55 - OPD Site Plan.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.