resolution · H-1
Resolution No. 2026-047 A Resolution Approving the Iowa Statewide Transportation Alternatives Set-Aside Program (TA Set-Aside) Application — H-1
Page 9 of 35
Text from the PDF text layer; check the PDF for anything that matters. |5
School Name(s): Clear Creek Amana Middle School and Clear Creek Amana High School
Grades of students at school(s): Middle School: 6th-8th Grade, High School: 9th-12th Grade
Number of students at school(s): Middle School: 747, High School: 833
Number of K-12 students at school(s): Middle School: 747, High School: 833
Distance eligibility for riding a bus (radius) in miles: K-8: 2 miles or more, 9-12: 3 miles or more
Number of K-12 students who currently walk to school: 100
Number of K-12 students who currently bicycle to school: 100
Number of K-12 students currently driven to school: 493
Number of K-12 students currently bused to school: 887
Number of K-12 students eligible for busing: 996
Number of K-12 students who attend this school and live within 2 miles: 584
Evaluating the Success of the Project. Please discuss your plans for evaluating the success of the project. The SRTS
program goal is to enable and encourage more students to walk and bicycle to school. How will you measure your
success? What method will you use to determine whether more students are walking or bicycling to school? What are
your specific user goals for this project? Your plans for measurement should minimally include using the student
survey forms provided at http://saferoutesdata.org to gather before and after figures for the number of K-12 students
who are: walking to school, bicycle to school, driven to school, and bused to school. Please provide a narrative
response in the space provided below. BE AS CONCISE AS POSSIBLE.
The goal of this project is to create a safer, more accessible route for students to walk or cycle to school and increase
the number of those that do. U.S. 6 does not have any pedestrian or bicyclist focused infrastructure running along it,
and this project aims to provide that missing path to encourage students in nearby neighborhoods to walk and bike to
school. Success of the project would be evaluated in both quantitative and qualitative ways as discussed below:
1. Survey forms will be sent out to parents to gather data on the number of students walking and cycling to school.
The form will also include fields to gather concerns about students walking to school and see if they were met after
construction. The form will be sent out both during design of the project and after construction to compare the data
and evaluate the impact the project had. The project would be considered successful if the number of students
reported walking or biking increased, and if parents felt their concerns about safety in the area had been addressed.
2. Official pedestrian/bike/vehicle counts will be taken before and after the project at morning drop off and afternoon
pick up. Counts would be taken over two days to achieve average volumes. Sufficient time will be provided between
the conclusion of construction and the count to allow users to become familiar with the new facilities. Crossing counts
will be taken at Roberts Ferry Rd and Deerview Ave before and after the project to determine if more students are
using the underpass. The project would be considered successful if the number of pedestrians/bicyclists increased
and if the crossing counts at the at-grade intersections decreased.
PART F – NARRATIVE QUESTIONS
Please provide a narrative response to each question in the space provided for each question below.
BE AS CONCISE AS POSSIBLE
1. Detailed Description of the Project. Please provide a clear description of the concept of the proposed project,
including such information as existing site conditions, trail length, number/acreage of parcels to be acquired,
general construction activities planned, etc. For a non-construction project, provide a summary of the planned
activities to be part of the project with a description of each. Remember to provide summary details of only the
project scope that is the subject of the funding request. Do not provide details of completed or future phases of a
project.
The U.S. 6 Pedestrian Trail and Underpass project is a crucial project to create a safe route to school for students
within the City of Tiffin, Iowa. Located between Deerview Ave and Roberts Ferry Rd, this segment of U.S. 6 is a vital
corridor for students traveling to school. The primary objective of this project is to construct approximately 0.61 miles
Sources
- revize: H-1 (qqh90ssRBjM0YMSB9978GDhkmHl9AG.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: H-1 Resolution No. 2026-047 A Resolution Approving the Iowa Statewide Transportation...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.