engineering report · M-6
M-6 - Engineer Report - MSA
Page 2 of 2
Text from the PDF text layer; check the PDF for anything that matters. City of Tiffin
September 1, 2022
PROJECT UPDATE
Deer View Avenue and Tall DOT has requested concurrence from the City on permanent TBD
Grass Avenue & Hwy 6 improvements to intersection within 5 years of installation of
Intersection Improvements temporary traffic signals in 2020. Scope includes both
pedestrian and vehicle accommodations.
Highway 6 Concept and Cost Estimate
MSA submitted conceptual plans and typical section to the Iowa DOT for review on July 25, 2022. Once
concurrence of the conceptual plans is received, MSA will develop a construction cost estimate for the
proposed work.
The Iowa DOT provided MSA updated traffic projections for US 6 on June 14, 2022. The Iowa DOT completed
their review on June 22, 2022 of the Prairie Valley Development Traffic Impact Study with comments. The Iowa
DOT provided comments regarding the need for an updated traffic study at Kimberlite Street since the last one
was completed in 2019 and includes outdated traffic projections and turning movements. MSA will work with
the City and other firms to determine course of action to update the traffic study.
Field topo survey will begin this fall. This would allow for preliminary design to begin over this upcoming winter
season.
Preliminary Water and Wastewater Evaluation
MSA has completed the water treatment and wastewater treatment evaluations. Upon review of the reports
with city staff, MSA is preparing a project schedule to supplement the memo and outline when the
infrastructure improvements can be designed and constructed.
DEVELOPMENT ASSISTANCE
Park Place Part 8
The developer’s engineer provided revised plans on August 16, 2022 and August 25, 2022. All review
comments provided by MSA have been addressed by the developer’s engineer.
Madden Addition Lot 55 OPD
All review comments provided by MSA have been addressed by the developer’s engineer.
Shamrock Center Lot 3 Site Plan
All review comments provided by MSA have been addressed by the developer’s engineer.
Madden Addition Pedestrian Bridge
MSA staff will perform an initial bridge inspection of the completed pedestrian bridge in Madden Addition in
September.
Sidewalk/Trail Connection
MSA will design and develop plans for a sidewalk/trail connection from the SE quadrant of the roundabout at
Park Road to the soccer field parking lot. Survey will begin shortly.
PROJECT UPDATE
Page 2 of 2