contract agreement · K-2

K-2 - Change Order 2 - Boomerang - Well 5 Pump, Controls and Watermain

Open the PDF Searchable (OCR) PDF

Page 1 of 1

Text read by the vision model; check the PDF for anything that matters.
March 2, 2023 CHANGE ORDER NO. 2 WELL 5 PUMP, CONTROLS AND WATER MAIN TIFFIN, IOWA Change Order No. 2 is for the following modifications to the project: 1. Install 6” auxiliary valve, holding spool, restraints, and City furnished hydrant to replace yard hydrant at WTP. LS $4,702.00 2. Cost increase to provide restrained joint ductile iron pipe in place of pvc water main on upstream and downstream sides of railroad augered crossing. (adjusts for bid item discrepancy) 140 LF @ $26/LF $3,640.00 3. Replace wire and conduit for conduit P-3 to match P-2. This Item accounts for the difference in the wire sizes and conduit size for this power wire and conduit. LS $739.57 Total: $9,081.57 Change Order No. 2 increases the contract amount by $9,081.57. BOOMERANG CORP. By Keegan Swink Title Project Manager Date 3/2/23 CITY OF TIFFIN, IOWA By ____________________________ Title __________________________ Date __________________________ VEENSTRA & KIMM, INC. By Dave Solaghi Title Project Engineer Date March 2, 2023 V&K Job No. 5093/1 ATTEST: By ____________________________ Title __________________________ Date __________________________

Sources

  • sharepoint (K-2 - Change Order 2 - Boomerang - Well 5 Pump, Controls and Watermain.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.