contract agreement · K-2
K-2 - Change Order 2 - Boomerang - Well 5 Pump, Controls and Watermain
Page 1 of 1
Text read by the vision model; check the PDF for anything that matters.March 2, 2023
CHANGE ORDER NO. 2
WELL 5 PUMP, CONTROLS AND WATER MAIN
TIFFIN, IOWA
Change Order No. 2 is for the following modifications to the project:
1. Install 6” auxiliary valve, holding spool, restraints, and City furnished hydrant to replace yard hydrant at WTP. LS $4,702.00
2. Cost increase to provide restrained joint ductile iron pipe in place of pvc water main on upstream and downstream sides of railroad augered crossing. (adjusts for bid item discrepancy)
140 LF @ $26/LF $3,640.00
3. Replace wire and conduit for conduit P-3 to match P-2. This Item accounts for the difference in the wire sizes and conduit size for this power wire and conduit. LS $739.57
Total: $9,081.57
Change Order No. 2 increases the contract amount by $9,081.57.
BOOMERANG CORP.
By Keegan Swink
Title Project Manager
Date 3/2/23
CITY OF TIFFIN, IOWA
By ____________________________
Title __________________________
Date __________________________
VEENSTRA & KIMM, INC.
By Dave Solaghi
Title Project Engineer
Date March 2, 2023
V&K Job No. 5093/1
ATTEST:
By ____________________________
Title __________________________
Date __________________________
Sources
- sharepoint (K-2 - Change Order 2 - Boomerang - Well 5 Pump, Controls and Watermain.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.