resolution · I-3
I-3 - Resolution 2023-021 - Setting a PH Date for Stormwater Easement - Hawk Wash
Page 2 of 2
Text read by OCR; check the PDF for anything that matters. 1.00 AC
SITE PLAN
LOT 1, HOYT'S 1ST SUBDIVISION
TIFFIN, JOHNSON COUNTY, IOWA
PLAT PREPARED BY: OWNER/APPLICANT. APPLICANT'S ATTORNEY
MMS CONSULTANTSINC, | HAWK WASH, LLC KARL SIGWARTH
Page 1917 S. GILBERT STREET 2793 HIGHWAY 6 NW BRADLEY & RILEY PC
= oa ae aa Pere z : = = oe IOWA CITY, 1A 52240 TIFFIN, 1A 52340 2007 1ST AVE SE
3 == or CEDAR RAPIDS, 1A 52402 STANDARD LEGEND AND NOTES
2BB- =
=>
CIVIL ENGINEERS
5 10 8 2
GRAPHIC SCALE IN FEET
1°=20'
~ExisT— PROP
ea E-4 POWER POLE LANDSCAPE ARCHITECTS
es 3 — POWER POLE
= = — POWER POLE W/TRANS
= == ~—— POWER POLE W/LGHT ENVIRONMENTAL SPECIALISTS
Bos =O - WY POLE
rd g UaiT Poe 1917 S. GILBERT ST.
Ss — SANITARY MANHOLE IOWA CITY, IOWA 52240
¥ ‘© = FIRE HYDRAN (319) 351-8282
@ — ~ WATER VALVE
net
www.mmsconsultants.
o e DRAINAGE MANHOLE,
= © = CURB INLET
= FENCE LUNE
GRADING
'000,00€X
LEGEND Provo Sah
— EXISTING STORM SEWER
PROPOSED SANITARY SEWER
@200.008% EXISTING SURFACE ————<« ———~ PROPOSED STORM SEWER
9000.00FG == FINISH GRADE CLECTRICAL LNES
[ Tuerowe Ones
“\ pons = TOP SAB ve =e CONTOUR LINES (1" INTERVAL) Re
701.03EX- G4: = 7 : BS ANY f .00Tw — PROPOSED GROUND
eee
s ij eS 4 a ; on 4S eS .sree mae OOO = BRISTING TREE UNETREE & SHRUB
02/09/23 PER CITY COMMENTS - RAN
i |: 9 900.00TS
TOP CURB & = EXISTING DECIDUOUS
ve B31S4 000.00TR . op RM % — EXISTING EVERGREEN
TREES & SHRUBS
e900.00NT = FG AT TOP WALL THE ACTUAL SIZE AND LOCATION OF ALL PROPOSED FACILITIES
MAN SHALL
ARE TOGE
BEVERIRED
PREPAREDWTHANDCONSTRUCTION
SUBMI DOCUMENTS, WHICH
A4ARENGO RD “ooonows «= FC AT BOTTOM WALL APPROVAL OF THIS DOCUMENT.
eanet e=
=a
ka 28
695.5275:
DETAILED SITE
GRADING PLAN
HAWK WASH
_ @lOWAu:
RE GNMACTOR Blau MONEY WEA
NO LESS THAN 48 HRS. IN ADVANCE
ONE CALL. TIFFIN
OF ANY DIGGINGOR EXCAVATION. JOHNSON COUNTY
JBLIC UTILITY FIXTURES ARE SHI EXISTING ON THE PLANS OR ENCOUNTERED
¥ITHIN IOWA
ICTION AREA, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE
SURVEYS AND RECORD!
ONLY. IT IS POSSIBLE THERE MAY BE OTHERS, THE EXISTENCE OF WHICH IS PRESENTLY NOT KNOWN
OR SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR EXISTENCE ANO EXACT
LOCATION AND
TO AVOID DAMAGE THERETO. NO CLAIMS
FOR ADDITIONAL COMPENSATION
WILL BE
ALLOWED TO THE CONTRACTOR FOR ANY INTERFERENCE OR DELAY CAUSED BY SUCH WORK.
- eee Le B B TSE q st C120 OVERALL SITE LAYOUT AND
= _ “ : : DIMENSION PLAN MMS CONSULTANTS, INC.
- a : e121 DETAILED SITE LAYOUT AND.
DIMENSION PLAN
Syren
09/01/2022
140 PRE-EROSION CONTROL AND Designed by. Field Book No:
1349
DEMOLITION PLAN
Drown by. [Scot
C141 OVERALL SITE GRADING AND
EROSION CONTROL AND SWPPP Checked by: [Sheet No:
C142 DETAILED SITE GRADING PLAN
c160
500
SITE UTILITY PLAN
GENERAL NOTES AND DETAILS
m= | 0142
L100 SITE LANDSCAPE PLAN 10860-002 [~~
Sources
- sharepoint (I-3 - Resolution 2023-021 - Setting a PH Date for Stormwater Easement - Hawk Wash.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.