other
WS - D - Water System Exhibits
Page 4 of 4
Text from the PDF text layer; check the PDF for anything that matters. CONCENTRATE TO
SAN. SEWER 82'-0" 22'-0"
C.I.P.
TANK
N.F. N.F. N.F.
N.F.
SKID #3 SKID #2 SKID #1
SKID #4
(FUTURE)
(FUTURE)
ROOM TO BE
USED FOR
MCC/ELECTRICAL CAUSTIC SODA
ROOM INJECTION
60'-0"
CONCENTRATE CONCENTRATE
ANTI-SCALANT
PERMEATE
TO CLEAR WELL
RAW WATER
FROM WELLS
CHLORINE
ROOM
WATER PLANT PLAN VIEW
0 4 8 16
PROJECT NO.: 13603007 SCALE: AS SHOWN NO. DATE REVISION BY FILE NO.
ENGINEERING | ARCHITECTURE | SURVEYING
PROJECT DATE: 2023 DRAWN BY: CWW
FUNDING | PLANNING | ENVIRONMENTAL TIFFIN WATER SYSTEM PRELIMINARY ENGINEERING REPORT 13603007
CHECKED BY: JM
400 Ice Harbor Drive, Dubuque IA 52001 CITY OF TIFFIN NEW R.O. BUILDING OPTION SHEET
(563) 582-3973 www.msa-ps.com
PLOT DATE: RO Layout_New Building (Exhibit).dgn 6/1/2023 1:50:39 PM cwienen
© MSA Professional Services, Inc.
JOHNSON COUNTY, IOWA EX 2
Sources
- sharepoint (WS - D - Water System Exhibits.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.