resolution · I-5

I-5 - Resolution 2023-052 - Establishing New Guidelines to Assess Fire Department Fees

Open the PDF Searchable (OCR) PDF

Page 8 of 9

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>Inspection Fees</th> <th>Description</th> <th>Fee Amount</th> <th>Notes</th> </tr> <tr> <td>Commerical Inspection</td> <td></td> <td>No Cost</td> <td>See Footnote #3</td> </tr> <tr> <td>1st Re-Inspection</td> <td>Conducted no sooner than 21 days from the initial inspection.</td> <td>No Cost</td> <td>See Footnote #3</td> </tr> <tr> <td>2nd Re-Inspection</td> <td>Conducted no sooner than 7 days from 1st re-inspection.</td> <td>$50.00</td> <td>See Footnote #3</td> </tr> <tr> <td>3rd Re-Inspection</td> <td>Conducted no sooner than 7 days from 2nd re-inspection.</td> <td>$50.00</td> <td>See Footnote #3</td> </tr> <tr> <td>Additional Re-Inspections</td> <td>Conducted no sooner than 7 days from previous re-inspection.</td> <td>Municipal Infraction</td> <td></td> </tr> <tr> <td>Additional per hour fee for after office hour fire inspections</td> <td></td> <td>$100.00</td> <td>See Footnote #4</td> </tr> <tr> <th colspan="4">Standby & Hazardous Materials Response Fees</th> </tr> <tr> <td>Heavy Response</td> <td>Command, Engine 151, Engine 152, Ladder 155, Rescue 159 includes up to 4 personnel.</td> <td>See Footnote #6</td> <td></td> </tr> <tr> <td>Light Response Apparatus</td> <td>Command, Engine 151, Grass Truck 158, Tanker 156 and staff vehicles, includes up to 2 personnel.</td> <td>See Footnote #6</td> <td></td> </tr> <tr> <td>Extra Response Personnel</td> <td>Each additional personnel.</td> <td>See Footnote #6</td> <td></td> </tr> <tr> <td>Expended Materials</td> <td>Personal protective equipment, hose, nozzles; apparatus, etc.</td> <td>Replacement Cost, including shipping</td> <td>See Footnote #6</td> </tr> <tr> <td>Equipment repair and/or cleaning</td> <td>The repair or cleaning of equipment will be billed at parts & labor. (Personal protective equipment, hose, nozzle, apparatus, etc.).</td> <td>Cost (parts plus labor), including shipping</td> <td>See Footnote #6</td> </tr> <tr> <td>Damaged Equipment</td> <td>May include injury to, destruction of, or loss of natural resources, etc.</td> <td>Replacement and/or repair cost, including shipping.</td> <td>See Footnote #6</td> </tr> <tr> <th colspan="4">Other Fees</th> </tr> <tr> <td>Fire Alarm & Fire Protection Contractor's Operational Permit</td> <td>Required for any companies installing, maintaining or repairing any fire suppression, fire alarm & detection or fire extinguishers within the limits of the City of Tiffin. Only one license is required per company and will cover all employees.</td> <td>$100.00</td> <td>365 Days, January 1st-December 31st. Fee is not prorated</td> </tr> <tr> <td>Incident Report</td> <td>Fee required for incident reports or information requests.</td> <td>$10.00</td> <td></td> </tr> <tr> <td>FOIA Request</td> <td>Fee required for large FOIA request. (More than an Incident Report)</td> <td>(Hard copy) $35.00/per hr & $.10 per sheet.<br>(Digital)$35.00/per hr + cost of USB / current technology.</td> <td></td> </tr> </table>

Sources

  • sharepoint (I-5 - Resolution 2023-052 - Establishing New Guidelines to Assess Fire Department Fees.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.