resolution · I-5
I-5 - Resolution 2023-052 - Establishing New Guidelines to Assess Fire Department Fees
Dated July 18, 2023City Council — regular meeting, July 18, 2023 9 pages
Ord. 2021-487, Res. 2023-052
Page 7 of 9
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Construction Permits</th>
<th>Description</th>
<th>Fee Amount</th>
<th>Notes</th>
</tr>
<tr>
<td>Standpipe systems</td>
<td>Required for the installation, modification or removal from service of a standpipe system. Maintenance performed in accordance with this code is not considered to be a modification and does not require a permit.</td>
<td>$125 per Standpipe riser</td>
<td></td>
</tr>
<tr>
<td>Temporary membrane structures and tents</td>
<td>Required to erect an air-supported temporary membrane structure, a temporary stage canopy or a tent having an area in excess of 400 square feet. See exceptions</td>
<td>$75 / Tent</td>
<td>Up to 7 days</td>
</tr>
<tr>
<td>All other Construction Permits listed in IFC</td>
<td></td>
<td>$125.00</td>
<td></td>
</tr>
<tr>
<td>Failure to Secure Permit</td>
<td>Beginning work, or maintain an operation without a required permit shall double the permit fee. A stop work order shall be issued until payment is received and permit issued.</td>
<td>Fee is Double the Permit Fee</td>
<td></td>
</tr>
</table>
Sources
- sharepoint (I-5 - Resolution 2023-052 - Establishing New Guidelines to Assess Fire Department Fees.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.