resolution · I-5

I-5 - Resolution 2023-052 - Establishing New Guidelines to Assess Fire Department Fees

Open the PDF Searchable (OCR) PDF

Page 5 of 9

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>Construction Permits</th> <th>Description</th> <th>Fee Amount</th> <th>Notes</th> </tr> <tr> <td>Automatic fire extinguishing systems</td> <td>Required for installation of or modification to an automatic fire-extinguishing system. Maintenance performed in accordance with this code is not considered to be a modification and does not require a permit.<br>1) Automatic Sprinkler System (NFPA 13, 13R, 13D)<br>2) Kitchen Hood Suppression System<br>3) Alternative Automatic Fire-Extinguishing Systems</td> <td>$125.00 + $2 per Sprinkler Head<br>$125.00 per System<br>$125 + $1.00 / lb. of Agent</td> <td></td> </tr> <tr> <td>Compressed Gases</td> <td>Where the compressed gases in use or storage exceed the amounts listed in the IFC, a construction permit is required to install, repair damage to, abandon, remove, place temporarily out of service, or close or substantially modify a compressed gas system.</td> <td>$150.00</td> <td></td> </tr> <tr> <td>Emergency responder communication coverage system</td> <td>Required for installation of or modification to in-building, two-way emergency responder communication coverage systems and related equipment. Maintenance performed in accordance with this code is not considered to be a modification and does not require a construction permit.</td> <td>$125.00</td> <td></td> </tr> <tr> <td>Energy storage systems (Residential & Commercial)</td> <td>Required to install energy storage systems regulated by IFC & IRC.</td> <td>$50.00 Residential<br>$125.00 Commercial</td> <td></td> </tr> <tr> <td>Fire alarm & detection equipment & related equipment</td> <td>Required for installation of or modification to fire alarm and detection systems and related equipment. Maintenance performed in accordance with this code is not considered to be a modification and does not require a construction permit.</td> <td>$125 + $2 per Warning & Initiating Device</td> <td></td> </tr> <tr> <td>Fire smoke alarms in Mult-Family Dwellings</td> <td>Required for installation of smoke alarms installed in Multi-Family dwellings constructed under the IBC.</td> <td>$50 + $2 per Warning & Initiating Device</td> <td></td> </tr> <tr> <td>Fire pumps and related equipment</td> <td>Required for installation of or modification to fire pumps and related fuel tanks, jockey pumps, controllers and generators. Maintenance performed in accordance with this code is not considered to be a modification and does not require a construction permit.</td> <td>$125 per Fire Pump</td> <td></td> </tr> <tr> <td>Flammable and combustible liquids</td> <td>Required as defined in the IFC.</td> <td>$150.00</td> <td></td> </tr> <tr> <td>Gas Detection System</td> <td>Required for the installation of or modification to gas detection systems. Maintenance performed in accordance with this code is not considered a modification and shall not require a permit.</td> <td>$125 + $2 per Detection Device</td> <td></td> </tr> <tr> <td>Gates and barricades across fire apparatus access roads</td> <td>Gates and barricades across fire apparatus access roads.</td> <td>$75.00</td> <td></td> </tr> </table>

Sources

  • sharepoint (I-5 - Resolution 2023-052 - Establishing New Guidelines to Assess Fire Department Fees.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.