resolution · I-5
I-5 - Resolution 2023-052 - Establishing New Guidelines to Assess Fire Department Fees
Dated July 18, 2023City Council — regular meeting, July 18, 2023 9 pages
Ord. 2021-487, Res. 2023-052
Page 5 of 9
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Construction Permits</th>
<th>Description</th>
<th>Fee Amount</th>
<th>Notes</th>
</tr>
<tr>
<td>Automatic fire extinguishing systems</td>
<td>Required for installation of or modification to an automatic fire-extinguishing system. Maintenance performed in accordance with this code is not considered to be a modification and does not require a permit.<br>1) Automatic Sprinkler System (NFPA 13, 13R, 13D)<br>2) Kitchen Hood Suppression System<br>3) Alternative Automatic Fire-Extinguishing Systems</td>
<td>$125.00 + $2 per Sprinkler Head<br>$125.00 per System<br>$125 + $1.00 / lb. of Agent</td>
<td></td>
</tr>
<tr>
<td>Compressed Gases</td>
<td>Where the compressed gases in use or storage exceed the amounts listed in the IFC, a construction permit is required to install, repair damage to, abandon, remove, place temporarily out of service, or close or substantially modify a compressed gas system.</td>
<td>$150.00</td>
<td></td>
</tr>
<tr>
<td>Emergency responder communication coverage system</td>
<td>Required for installation of or modification to in-building, two-way emergency responder communication coverage systems and related equipment. Maintenance performed in accordance with this code is not considered to be a modification and does not require a construction permit.</td>
<td>$125.00</td>
<td></td>
</tr>
<tr>
<td>Energy storage systems (Residential & Commercial)</td>
<td>Required to install energy storage systems regulated by IFC & IRC.</td>
<td>$50.00 Residential<br>$125.00 Commercial</td>
<td></td>
</tr>
<tr>
<td>Fire alarm & detection equipment & related equipment</td>
<td>Required for installation of or modification to fire alarm and detection systems and related equipment. Maintenance performed in accordance with this code is not considered to be a modification and does not require a construction permit.</td>
<td>$125 + $2 per Warning & Initiating Device</td>
<td></td>
</tr>
<tr>
<td>Fire smoke alarms in Mult-Family Dwellings</td>
<td>Required for installation of smoke alarms installed in Multi-Family dwellings constructed under the IBC.</td>
<td>$50 + $2 per Warning & Initiating Device</td>
<td></td>
</tr>
<tr>
<td>Fire pumps and related equipment</td>
<td>Required for installation of or modification to fire pumps and related fuel tanks, jockey pumps, controllers and generators. Maintenance performed in accordance with this code is not considered to be a modification and does not require a construction permit.</td>
<td>$125 per Fire Pump</td>
<td></td>
</tr>
<tr>
<td>Flammable and combustible liquids</td>
<td>Required as defined in the IFC.</td>
<td>$150.00</td>
<td></td>
</tr>
<tr>
<td>Gas Detection System</td>
<td>Required for the installation of or modification to gas detection systems. Maintenance performed in accordance with this code is not considered a modification and shall not require a permit.</td>
<td>$125 + $2 per Detection Device</td>
<td></td>
</tr>
<tr>
<td>Gates and barricades across fire apparatus access roads</td>
<td>Gates and barricades across fire apparatus access roads.</td>
<td>$75.00</td>
<td></td>
</tr>
</table>
Sources
- sharepoint (I-5 - Resolution 2023-052 - Establishing New Guidelines to Assess Fire Department Fees.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.