resolution · I-5
I-5 - Resolution 2023-052 - Establishing New Guidelines to Assess Fire Department Fees
Dated July 18, 2023City Council — regular meeting, July 18, 2023 9 pages
Ord. 2021-487, Res. 2023-052
Page 4 of 9
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Operational Permits (Continued)</th>
<th>Description</th>
<th>Fee Amount</th>
<th>Term</th>
</tr>
<tr>
<td>Open burning</td>
<td>Kindling or maintaining of an open flame or a fire on any public street, alley, road, or other public or private ground. Instructions and stipulations of the permit shall be adhered to. Exceptions are recreational fires.</td>
<td>$100.00</td>
<td>Per Open Burn Ordinance. See Footnote #5</td>
</tr>
<tr>
<td>Open flames and candles</td>
<td>Required to use open flames or candles in connection with assembly areas, dining areas of restaurants, or drinking establishments.</td>
<td>$50.00</td>
<td>365 Days</td>
</tr>
<tr>
<td>Organic coatings</td>
<td>Required for any organic-coating manufacturing operation producing more than 1 gallon of an organic coating in one day.</td>
<td>$150.00</td>
<td>365 Days</td>
</tr>
<tr>
<td>Plant extraction systems</td>
<td>Required to use plant extraction systems.</td>
<td>$200.00</td>
<td>365 Days</td>
</tr>
<tr>
<td>Pyrotechnic special effects material</td>
<td>Required for use and handling of pyrotechnic special effects material.</td>
<td>$150.00</td>
<td>Per Event</td>
</tr>
<tr>
<td>Pyroxylin plastics</td>
<td>Required for storage and handling of more than 25 pounds of cellulose nitrate plastics and for the assemble or manufacture of articles involving Pyroxylin plastics.</td>
<td>$100.00</td>
<td>365 Days</td>
</tr>
<tr>
<td>Refrigeration equipment</td>
<td>Required to operate a mechanical refrigeration unit or system regulated by the IFC.</td>
<td>$100.00</td>
<td>365 Days</td>
</tr>
<tr>
<td>Repair garages and motor fuel-dispensing facilities</td>
<td>Repair garages and motor fuel-dispensing facilities</td>
<td>$100.00</td>
<td>365 Days</td>
</tr>
<tr>
<td>Spraying or dipping</td>
<td>required to conduct a spraying or dipping operation utilizing flammable or combustible liquids, or the application of combustible powders regulated by the IFC.</td>
<td>$150.00</td>
<td>365 Days</td>
</tr>
<tr>
<td>Storage of scrap tires and tire byproducts</td>
<td>An operational permit is required to establish, conduct or maintain storage of scrap tires and tire byproducts that exceeds 2,500 cubic feet of total volume of scrap tires, and for indoor storage of tires and tire byproducts.</td>
<td>$150.00</td>
<td>365 Days</td>
</tr>
<tr>
<td>Temporary membrane structures and tents</td>
<td>Required to operate an air-supported temporary membrane structure, a temporary special event structure or a tent having an area in excess of 400 square feet. See Exception in IFC.</td>
<td>$75.00/Tent</td>
<td>After 7 days, up to 30 days unless allowed longer by another code.</td>
</tr>
<tr>
<td>Waste handling</td>
<td>Required for the operation of wrecking yards, junk yards and waste material-handling facilities.</td>
<td>$100.00</td>
<td>365 Days</td>
</tr>
<tr>
<td>All other Operational Permits listed in IFC</td>
<td></td>
<td>$100.00</td>
<td></td>
</tr>
<tr>
<td>Failure to Secure Permit</td>
<td>Any occupancy operating without a required permit shall double the permit fee. A stop work order shall be issued until payment is received and permit issued.</td>
<td>Fee is Double the Permit Fee</td>
<td></td>
</tr>
</table>
*Operational permits shall be submitted not less than 14 days prior to the event requiring a permit.
Sources
- sharepoint (I-5 - Resolution 2023-052 - Establishing New Guidelines to Assess Fire Department Fees.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.