contract agreement · K-3
K-3 - Professional Services Agreement with MSA - Highway 6 Reconstruction
Page 5 of 6
Text read by the vision model; check the PDF for anything that matters.LEGEND:
CITY OF TIFIN PAVEMENT LIMITS
IOWA DOT PAVEMENT LIMITS
BEGIN PROJECT STA 12+63.40
XX:20500.819.447
PROPOSED PAVED SHOULDER WITH CURB AND GUTTER
SI (TYP.)
EXTENSION TO EXISTING STRUCTURE RECD
APPROXIMATE EXISTING R/W (TYP.)
APPROXIMATE EXISTING R/W (TYP.)
PROPOSED SIDEWALK
PROPOSED STORM SEWER, SEE D SHEETS FOR DETAILS
PROPOSED PAVED SHOULDER WITH CURB AND GUTTER
SI (TYP.)
APPROXIMATE EXISTING R/W (TYP.)
PROPOSED SIDEWALK
PROPOSED STORM SEWER, SEE D SHEETS FOR DETAILS
APPROXIMATE EXISTING R/W (TYP.)
PROPOSED PAVED SHOULDER
FOR PLANNING PURPOSES ONLY
Sources
- sharepoint (K-3 - Professional Services Agreement with MSA - Highway 6 Reconstruction.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.