contract agreement · K-3
K-3 - Pay Application 1 - McComas Lacina - Sidewalk to Soccer Fields
Page 2 of 3
Text read by OCR; check the PDF for anything that matters. APPLICATION FOR PARTIAL PAYMENT OF CONTRACT
CONTRACT PRICE DETAIL
item [DESCRIPTION oricinaL | Trance | TOTAL QUAN VALUEOF | REMAINING | PERCENT
NO. | ieclude Change Order # if Ap licabie) TS eo
cary. | (BY CHANGE quantity | UNFTPRICE | EXTENDED PRICE | compiere [comMPLETED WORK] QUANTITY | COMPLETE
01, [Topsoll, On-Site, 6-in. C 72 172,00 2.96 2,229.12 728.00 1671.84 43.00 [__78,00%|
2.02 excavation, Class 10, Cut C 22 22.00 2.96 285.12 22.00 .
03 jExcavation, Class 10, Borrow C 244 244.00 21,60 5,270.40 183.00 E .
04 [Compaction Testin: LS i 00 1,728.00 1f28.00 80 1,382,
4.01 [Pipe Culvert, Trenched, RCP, 15-In LF 73 73.00 08,00 1,884.00 73.00 7 B84.
4 EA 2 2.00 | 1,620.00 3,240.00 : 3,240.
7 SY 305 305.00 53.46 21,116.70 | _296.25 15,837.53
7.02 |S sY 275 275.00 10.80 2,970.00 | 206.25 2,227.50
Detectable Wamings SY 40 40.00 54.00 2,160.00 20.00 fl
/.04 [Shared Use Path Assurance Testin: x 00 1,728.00 128,00 0.50
. Pavement Markings, Waterborne, Yellow 5 1 00 324.00 324.00
.02_|Pavement Markings, Removed L 1 0 62.00 62.0
03 {Tempore TaeControl : 1 0 540.00 540.00 100
.04 jRemove, Salvage, Relocate Sign _EA Z 2.00 259.20 18.40
.01 |Hydraulic Seeding, Fertilizing, And Mulching (BRM), Type 1 Ls 1 00 1,917.00 917.00 _-
Ss Rip Rap, Erosion Stone TONS 36 36.0 64.80 2,332.80| 36.00 2,332.80
i 600 600.00 3.24 944.00
: LF 600 600.00 0.27 62,00
.05 {Hydraulic Mulching, Temporary Ls 4 00 40.00 340.00
11.01 {Mobitization, Bonds, And Insurance Li 4 00 7,344.00 7,344.00 1.00 7,344.00
11.02 [Concrete Washout E 1 00 40.00 940.00 0.75
CO
# [Change Orders
TOTAL CONTRACT AND VALUE OF WORK COMPLETED TO DATE $ 64,935.54 $ 49,046.99 poe 3,
Date printed: 1/2/2024
Sources
- sharepoint (K-3 - Pay Application 1 - McComas Lacina - Sidewalk to Soccer Fields.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.