contract agreement · K-4
K-4 - Professional Services Agreement - Highway 6 Reconstruction - MSA
Page 1 of 13
Text read by the vision model; check the PDF for anything that matters.Professional Services Agreement
MSA Project Number: 13603014
This AGREEMENT (Agreement) is made effective February 13, 2024 by and between
MSA PROFESSIONAL SERVICES, INC (MSA)
Address: 6045 Rockwell Drive NE Cedar Rapids, IA 52402
Phone: (319) 364-4773
Representative: James Watters Email: [email protected]
CITY OF TIFFIN (OWNER)
Address: 300 Railroad Street, Tiffin, IA 52340
Phone: (319)545-2572
Representative: Doug Boldt Email: [email protected]
Project Name: STP-006-7(098)--2C-52 - USH 6 Reconstruction (Marengo Rd) Design Services
The scope of the work authorized is: See Attachment A: Scope of Services
The schedule to perform the work is:
Approximate Start Date: February 1, 2024
Approximate Completion Date: December 31, 2026
The lump sum fee for the work is: $602,805.00
All services shall be performed in accordance with the General Terms and Conditions of MSA, which is attached and made part of this Agreement. Any attachments or exhibits referenced in this Agreement are made part of this Agreement. Payment for these services will be on a lump sum basis.
Approval: Authorization to proceed is acknowledged by signatures of the parties to this Agreement.
CITY OF TIFFIN
______________________________
Doug Boldt
City Administrator
Date: _______________________
MSA PROFESSIONAL SERVICES, INC.
______________________________
Kevin Ruhland
Vice President - Mobility
Date: 2/13/24
______________________________
James Watters
Project Manager
Date: 2/13/24
Sources
- sharepoint (K-4 - Professional Services Agreement - Highway 6 Reconstruction - MSA.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.