a. CITY shall have the right to make excavations within the Temporary Easement Area,
and to grade as CITY may find reasonably necessary for the construction. CITY
covenants and agrees to protect such excavations during construction; to promptly
fill said excavations following construction; and to hold OWNERS harmless from
third party liability during said construction.
b. CITY shall promptly backfill any trench made by it, and repair any damages caused
by CITY within the Temporary Easement Area, but excluding the replacement of
trees, shrubs and brush on the Temporary Easement Area.
c. CITY shall indemnify OWNERS against any loss or damage which occurs as a result
of CITY's, or its agent’s, contractor’s, or representative’s, acts or omissions in the exercise
of its easement rights herein. Once the Temporary Easement Area has been restored
substantially to its prior condition and except as expressly provided in this
Temporary Easement Agreement, CITY shall have no further responsibility for
maintaining the Temporary Easement Area.
d. CITY shall have the right of ingress and egress to and from the Temporary Easement
Area by such route within the Temporary Easement Area as shall occasion the least
practical damage and inconvenience to OWNERS.
e. CITY shall have the right to trim or remove all structures, trees, brush, and any other
landscaping features which may interfere with the exercise of CITY's rights pursuant
to this Agreement.
5. CITY covenants and agrees that existing driveways, fences, underground drainage tile or
other site features, with the exception of trees, shrubs and brush, which are removed or disturbed
shall, to the extent reasonably possible, be replaced by CITY to conform with features or items
removed during construction. CITY further agrees that all grassed areas disturbed by the
construction shall be seeded within a reasonable time after construction is complete.
6. CITY covenants and agrees to remove and stockpile existing topsoil from areas to be
excavated, to be used in the event of any repair. Following installation of the public improvement,
all areas within the Temporary Easement Area which are disturbed will be graded to form a
uniform slope, and topsoil shall be replaced and respread over disturbed areas, thereby restoring
said area substantially to its prior condition, with the exception of the replacement of trees, shrubs
and brush.
7. CITY shall remove all of their materials and equipment from the Temporary Easement
Area on or before the date this easement expires under Section 3.
8. The provisions hereof shall inure to the benefit of and bind the successors and assigns of the
respective parties hereto, shall be deemed a covenant which runs with the land and with the title to
Sources
- sharepoint (I-1 - Temporary Construction Easement Agreement - CCA.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.