contract agreement · K-3
K-3 - Professional Services Agreement - Recreation Center - Atura Architecture
Page 8 of 9
Text read by the vision model; check the PDF for anything that matters..3 Other
(Describe the method of compensation)
§ 11.2 For the Architect’s Supplemental Services designated in Section 4.1.1 and for any Sustainability Services required pursuant to Section 4.1.3, the Owner shall compensate the Architect as follows:
(Insert amount of, or basis for, compensation. If necessary, list specific services to which particular methods of compensation apply.)
§ 11.3 For Additional Services that may arise during the course of the Project, including those under Section 4.2, the Owner shall compensate the Architect as follows:
(Insert amount of, or basis for, compensation.)
Compensation shall be on an hourly basis. Hourly rates are as follows:
<table>
<tr>
<th>Architect Manager</th>
<td>$180.00/hr</td>
</tr>
<tr>
<th>Architect II</th>
<td>$170.00/hr</td>
</tr>
<tr>
<th>Architect I</th>
<td>$160.00/hr</td>
</tr>
<tr>
<th>Sr. Project Designer</th>
<td>$150.00/hr</td>
</tr>
<tr>
<th>Project Designer</th>
<td>$120.00/hr</td>
</tr>
<tr>
<th>Design Tech Specialist II</th>
<td>$110.00/hr</td>
</tr>
<tr>
<th>Design Tech Specialist I</th>
<td>$100.00/hr</td>
</tr>
<tr>
<th>Interior Designer II</th>
<td>$110.00/hr</td>
</tr>
<tr>
<th>Interior Designer I</th>
<td>$90.00/hr</td>
</tr>
<tr>
<th>Graphic Designer</th>
<td>$105.00/hr</td>
</tr>
<tr>
<th>Clerical</th>
<td>$65.00/hr</td>
</tr>
</table>
§ 11.4 Compensation for Supplemental and Additional Services of the Architect’s consultants when not included in Sections 11.2 or 11.3, shall be the amount invoiced to the Architect plus percent ( %), or as follows:
(Insert amount of, or basis for computing, Architect’s consultants’ compensation for Supplemental or Additional Services.)
§ 11.5 When compensation for Basic Services is based on a stipulated sum or a percentage basis, the proportion of compensation for each phase of services shall be as follows:
(Rows deleted)
<table>
<tr>
<th>Design Development Phase</th>
<td>Thirty percent ( 30 %)</td>
</tr>
<tr>
<th>Construction Documents Phase</th>
<td>Fifty percent ( 50 %)</td>
</tr>
<tr>
<th>Construction Phase</th>
<td>Fifteen percent ( 15 %)</td>
</tr>
<tr>
<th>Procurement Phase</th>
<td>Five percent ( 5 %)</td>
</tr>
<tr>
<th>Total Basic Compensation</th>
<td>one hundred percent ( 100 %)</td>
</tr>
</table>
The Owner acknowledges that with an accelerated Project delivery, multiple bid package process, or Construction Manager as constructor project delivery method, the Architect may be providing its services in multiple Phases simultaneously. Therefore, the Architect shall be permitted to invoice monthly in proportion to services performed in each Phase of Services, as appropriate.
§ 11.6 When compensation identified in Section 11.1 is on a percentage basis, progress payments for each phase of Basic Services shall be calculated by multiplying the percentages identified in this Article by the Owner’s most recent budget for the Cost of the Work. Compensation paid in previous progress payments shall not be adjusted based on subsequent updates to the Owner’s budget for the Cost of the Work.
Sources
- sharepoint (K-3 - Professional Services Agreement - Recreation Center - Atura Architecture.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.