K-4 - Change Order 2 - Original Town Phase 3 - Rathje Construction

Open the PDF Searchable (OCR) PDF

Page 2 of 2

Text read by the vision model; check the PDF for anything that matters.
CHANGE ORDER REQUEST DATE: 11/5/2024 CONTRACT # 0 CHANGE ORDER REQUEST NO. 2 PROJECT: Tiffin Phase 3 Reconstruction Project Send with pay app. CONTRACTOR: Rathje Construction CONTRACTOR PROJECT MANAGER: Dan Scofield CITY OF TIFFIN CONSTRUCTION PROJECT MANAGER: Ben Carnoff DESCRIPTION OF REQUEST: 1. After trees were removed per plan, it was requested that we remove the 2 large trees @ 240 Third Street and grind the stumps. Remove 2 smaller ash trees @ 141 E. 3rd Street. Stumps were pulled and hauled away due to conflict with the proposed sidewalk wall. At 300 E Main Street a large evergreen, multiple saplings and bushes were removed and trimmed branches from the large Aspen tree that would overhang the proposed sidewalk. Stump was ground on the Evergreen and the rest were pulled and hauled away to be processed. 2. Fire Hydrant on the NE corner of Third & Summerhayes was installed to grade shown on staking. When curb was installed the hydrant was 6" to low and has to be raised to match the sidewalk. 3. The home owner at 107 Third Street requested some additional concrete removal and replacement (8'x9') pad and stub the roof drain tile under the slab prior to replacement. After talking to Doug Bolt it was approved to run this additional work through the contract and the city would get with the homeowner for payment. 4. Due to dirt backfill pressure concerns against the wall, it was decided to backfill the Combination Retaining wall with all drainable backfill and filter fabric the entire envelope to keep the dirt out of the rock to keep the water pressure draining through the 4" tile to the storm sewer or through weep holes in the wall. The drainable backfill was left down 8" from the top of wall for topsoil. Rock tickets attached. Plans called for 22 tons, an additional 121.41 tons was placed. This included all material, equipment and labor to install. Work has been completed. SUDAS SPECIFICATION SECTION TO SUPPORT REQUEST, DIVISION 1: JUSTIFICATION FOR THE REQUEST, WORKING DIVISION: <table> <tr> <th>Line No.</th> <th>Item No.</th> <th>Item Description</th> <th>Quantity</th> <th>Unit</th> <th>Unit Price</th> <th>Mark up</th> <th>Unit Price w/ Markup</th> <th>Working Days Requested</th> <th>Proposed Increase (Decrease) In Contract Price</th> </tr> <tr> <td>1</td> <td></td> <td>Additional Tree & Stump Removal</td> <td>1.00</td> <td>LS</td> <td>$7,800.00</td> <td>0.00%</td> <td>$7,800.00</td> <td>1</td> <td>$7,800.00</td> </tr> <tr> <td>2</td> <td></td> <td>Fire Hydrant Extension</td> <td>1.00</td> <td>LS</td> <td>$1,500.00</td> <td>0.00%</td> <td>$1,500.00</td> <td>0</td> <td>$1,500.00</td> </tr> <tr> <td>3</td> <td></td> <td>107 Third street</td> <td>1.00</td> <td>LS</td> <td>$1,200.00</td> <td>0.00%</td> <td>$1,200.00</td> <td>0.5</td> <td>$1,200.00</td> </tr> <tr> <td>4</td> <td></td> <td>Additional Rock Behind Combo Wall</td> <td>440.00</td> <td>LF</td> <td>$22.50</td> <td>0.00%</td> <td>$22.50</td> <td>1</td> <td>$9,900.00</td> </tr> </table> Net Increase (Decrease): $20,400.00 SUPPORT DOCUMENTS INCLUDED: CONTRACT TIME IMPACT: (N/A) REVISED SCHEDULE PROVIDED? YES or NO STANDARD SUDAS BID ITEMS MUST BE USED IF POSSIBLE, OTHERWISE PROVIDE COST BREAKDOWN: INVOICES (REQUIRED): MATERIAL SUBMITTALS (REQUIRED): ADDITIONAL SUPPORT DOCUMENTS INCLUDED: This document does not change the Contract Price or Contract Time but is evidence that the parties expect that the subject changes will be incorporated into a subsequent Contract Change Order following negotiation by the parties as to effect, if any, upon Contract Price or Contract Time. Work shall not be deemed acknowledged per Division 1, General Provisions and Covenants until all signatures are received. Payment related to this document will only be made after execution of Contract Change Order through City Council.

Sources

  • sharepoint (K-4 - Change Order 2 - Original Town Phase 3 - Rathje Construction.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.