M-11 - Additional Sidewalk - Highway 6 Project
Page 1 of 3
Text from the PDF text layer; check the PDF for anything that matters. CONCEPT PLANS 08/04/23
LEGEND
CITY OF TIFFIN PAVEMENT LIMITS
IOWA DOT PAVEMENT LIMITS
Additional Sidewalk
STEPHANS ST
PROPOSED PAVED SHOLDER EXTENSION TO EXISTING
WITH CURB AND GUTTER STRUCTURE REQ'D
SI (TYP.)
APPROXIMATE EXISTING R/W (TYP.)
15+00 US 6 20+00 25+00
< <
< <
SUMMERHAYS
MAIN ST
PROPOSED SIDEWALK
STEPHANS ST
BEGIN PROJECT APPROXIMATE EXISTING R/W (TYP.)
STA 12+63.40 PROPOSED STORM SEWER,
Y=7,953,965.367
X=20,500,819.447 SEE D SHEETS FOR DETAILS
ST
NEED DECISION AS TO WHETHER TO INCLUDE THE SEGMENT OF
SIDEWALK SHOWN BELOW IN RED WITH THE PROJECT.
IF SIDEWALK IS DESIRED HERE, A COMBINATION SIDEWALK AND
RETAINING WALL WOULD NEED TO BE INSTALLED TO STAY WITHIN
EXISTING ROW AND REDUCE UTILITY IMPACTS (SEE LAST PAGE).
ITC INTERNATIONAL HAS OVERHEAD TRANSMISSION POLES ON
THE NORTH SIDE OF US6 HERE, RELOCATING THESE COULD BE
COSTLY EXPENSE
CROELL AVE
KIMBERLITE ST
PROPOSED PAVED SHOLDER SI (TYP.)
WITH CURB AND GUTTER PROPOSED PAVED SHOULDER
APPROXIMATE EXISTING R/W (TYP.)
US 6
30+00 35+00 40+00
< < <
PROPOSED STORM SEWER, APPROXIMATE EXISTING R/W (TYP.)
PROPOSED SIDEWALK SEE D SHEETS FOR DETAILS PROPOSED PAVED SHOULDER
FILE NO. ENGLISH DESIGN TEAM MSA PROFESSIONAL SERVICES JOHNSON COUNTY PROJECT NUMBER 13603009 SHEET NUMBER C.2
FOR PLANNING PURPOSES ONLY