PROJECT UPDATE
MSA received the concept report from DOT recommending replacement of areas of sidewalk along the
corridor on 11/8/2024. This work has been incorporated into the revised D5 plans sent to DOT on 11/22/24.
Comprehensive Water System Evaluation – Clint Wienen
The only item of consequence is that Doug and I had a conference call with the review Engineer on 11/20/24
to discuss the Viability Self-Assessment. A response letter and revised pages from the Viability Self-
Assessment were provided to the DNR on 11/25/2024.
Reverse Osmosis Water Treatment Plant Design – Clint Wienen
The plans, specs, and construction schedules were sent to the DNR on August 29, 2024 for approval.
Pedestrian light (RRFB) on eastern leg of roundabout at Hwy 6 & Park Road. – Andrew Inhelder
RRFBs are installed and operational. Contractor is reviewing the settings and connection to phones and
will provide additional information to City Staff.
Lead Service Line Inventory. – Andrew Inhelder
Report finalized for final review and submittal to the DNR by City Staff.
Fire Station Grading/Drainage Improvements. – Andrew Inhelder
MSA compiled several conceptual options with cost impacts and have sent to City Staff.
PROJECT UPDATE
Page 2 of 4
Sources
- sharepoint (M-8 - City Engineer Report.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.