contract agreement · K-5
K-5 - Professional Services Predesign Agreement with DOT - Highway 6 Improvements
Page 2 of 7
Text from the PDF text layer; check the PDF for anything that matters.January 2023
a. Grant Street: South side of U.S. 6, reconstructed with PCC pavement with curb and
gutter
b. Main Street: South side of U.S. 6, reconstructed with PCC pavement with curb and gutter
c. Summerhays Street: South side of U.S. 6, reconstructed with PCC pavement with curb
and gutter
d. South Brown Street: South side of U.S. 6, reconstructed with PCC pavement with curb
and gutter
e. Stephans Street: Both sides U.S. 6, reconstructed with PCC pavement with curb and
gutter
f. Croell Avenue: Both sides of U.S. 6, reconstructed with PCC pavement with curb and
gutter
g. Kimberlite Street: Both sides of U.S. 6, reconstructed with PCC pavement with curb and
gutter, including left and right turn-lanes
c. The LPA shall be responsible for 100% of the costs for the following improvements:
(1) Storm sewers, estimated cost $946,633
(2) Traffic signals at the intersection of U.S. 6 and Kimberlite Street, estimated cost $327,608
(3) Sidewalks, estimated cost $305,819
(4) Extending one existing culvert, estimated cost $147,916
(5) Water main and all associated appurtenances, estimated cost $330,480
d. The LPA shall be responsible for 50% of the costs for the following improvements:
(1) Mobilization, Temporary Traffic Control, and Erosion Control, estimated cost $282,683
e. The LPA shall be responsible for 48% of the costs for the following improvements:
(1) Miscellaneous and Contingency, estimated cost $627,000
f. The DOT shall bear all costs except those allocated to the LPA under other terms of this Agreement.
3. Project Design
a. The LPA or its consultant shall be responsible for the design of all proposed improvements.
b. The project plans, specifications and engineer's cost estimate shall be prepared and certified by a
Professional Engineer licensed to practice in the State of Iowa.
c. All proposed highway or street improvements shall be designed using the American Association of
State Highway and Transportation Officials (AASHTO) "Policy on Geometric Design of Highways and
Streets" (latest edition), or other equivalent generally recognized engineering or safety standard,
criteria, or design theory.
d. The project design shall comply with the "Manual on Uniform Traffic Control Devices for Streets and
Highways", by the Federal Highway Administration, as adopted by DOT per 761 Iowa Administrative
Code, Chapter 130.
4. Environmental, Right of Way, Permits and Other Requirements
a. Subject to the provisions herein, the LPA, in accordance with 761 Iowa Administrative Code Chapter
150, Rules 150.3(1)(c) and 150.4(2), shall remove or cause to be removed (within the corporate
2025-P-001_Tiffin 2
Sources
- sharepoint (K-5 - Professional Services Predesign Agreement with DOT - Highway 6 Improvements.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.