Text from the PDF text layer; check the PDF for anything that matters.PROJECT CONSTRUCTION COSTS
PROJECT: VILLAGE DRIVE EXTENSION - ADJACENT TO PROPOSED LOT 1
LOCATION: Tiffin, Iowa
DATE: April 23, 2025
EST UNIT TOTAL
ITEM NO. ITEM CODE DESCRIPTION UNIT Quant. PRICE PRICE
1 2010-C Clearing and Grubbing LS 1 $1,000.00 $1,000.00
2 2010-D Strip, Stockpile, and Repsread Topsoil (6") CY 400 $4.50 $1,800.00
3 2010-E Excavation, Class 10 CY 8,916 $2.63 $23,449.08
4 2010-G Subgrade Prep, (36' Street) SY 2,901 $0.70 $2,030.70
5 Backfill Curbs LS 0.2577 $4,264.00 $1,098.83
6 2010-I Subbase, Modified, 6-inch Thick (36' Street) SY 2,901 $6.53 $18,943.53
7 2010-L Compaction Testing LS 0.2577 $5,840.00 $1,504.97
8 11020-A Mobilization LS 0.2577 $42,489.12 $10,949.45
9 4010-A Sanitary Sewer Gravity Main, PVC, 8" Dia. LF 375 $48.40 $18,150.00
10
11 6010-A Sanitary Manhole, Type SW-301, 48" Dia. (With Chimney Seal) EA 1 $4,785.00 $4,785.00
12 6010-G Connection to Existing Sanitary Sewer Manhole EA 1 $728.50 $728.50
13
14
15 4020-A Storm Sewer Main, 15" RCP LF 80 $80.50 $6,440.00
16 4020-A Storm Sewer Main, 18" RCP LF 499 $74.90 $37,375.10
17 4040-A Subdrain Tile, HDPE With Porous Backfill, 6" Dia. LF 488 $15.40 $7,515.20
18 4040-C Subdrain Outlets EA 3 $161.00 $483.00
19 5010-A Connection to Existing Water Main EA 1 $1,142.00 $1,142.00
20 5010-A Water Main With Fittings, Trenched, 12" Dia. PVC (Village Drive) LF 499 $56.20 $28,043.80
21 5020-B MJ Gate Valve, 12" Dia. complete with Valve Box EA 2 $4,172.00 $8,344.00
22 5020-C Fire Hydrant Assembly EA 2 $7,851.00 $15,702.00
23 6010-B Storm Intake Top, Type SW-507 EA 1 $2,616.00 $2,616.00
24 6010-B Storm Intake, Type SW-509 EA 3 $7,046.00 $21,138.00
25 7010-A Pavement, Mainline PCC, 8" Thick (36' width) SY 2,611 $59.25 $154,701.75
26 GPS Machine Control LS 0.2577 $6,970.00 $1,796.17
27 7040-H Concrete Pavement Removal LS 1.0 $1,228.00 $1,228.00
28 Removals - Storm Sewer LF 25 $36.40 $910.00
29
30 9010-B Hydraulic Seeding, Fertilizing, and Mulching Ac 1.2 $2,150.00 $2,580.00
31 9040-A SWPPP Inspections MO 2 $250.00 $500.00
32 9040-N Rock Check Dam EA 2 $910.50 $1,821.00
33 9040-N Silt Fence, Install and Removal LF 510 $2.25 $1,147.50
34 9040-O Stabilized Construction Entrance EA 1 $2,085.00 $2,085.00
35 9040-T Inlet Protection Device, Surface Applied EA 6 $35.00 $210.00
36 11050-A Concrete Washout EA 1 $1,500.00 $1,500.00
37
PROJECT TOTAL = $381,718.58
10% $38,171.86
ESCROW TOTAL = $419,890.43