contract agreement · K-6

K-6 - Profession Services Agreement - MSA - North Park Road Construction Observation

Open the PDF Searchable (OCR) PDF

Page 8 of 10

Text read by the vision model; check the PDF for anything that matters.
requested by Owner; and performing or furnishing services required to revise studies, reports, Drawings, Specifications, or other Bidding Documents as a result of such review processes. 5. Preparing additional Bidding Documents or Contract Documents for alternate bids or prices requested by Owner for the Work or a portion thereof. 6. Assistance in connection with Bid protests, rebidding, or renegotiating contracts for construction, materials, equipment, or services. 7. Providing construction surveys and staking to enable Contractor to perform its work, and any type of property surveys or related engineering services needed for the transfer of interests in real property; and providing other special field surveys. 8. Providing Construction Phase services beyond the original date for completion and readiness for final payment of Contractor. 9. Providing assistance in responding to the presence of any hazardous materials at the Site, in compliance with current Laws and Regulations. 10. Preparation of operation and maintenance manuals. 11. Preparing to serve or serving as a consultant or witness for Owner in any litigation, arbitration, or other dispute resolution process related to the Project. 12. Providing more extensive services required to enable Engineer to issue notices or certifications requested by Owner. 13. Overtime, holiday, or night work requiring higher than regular rates. 14. Other services performed or furnished by Engineer not otherwise provided for in this Agreement. B. Additional Services Not Requiring Owner’s Written Authorization: Engineer shall advise Owner in advance that Engineer will immediately commence to perform or furnish the Additional Services of the types listed below. For such Additional Services, Engineer need not request or obtain specific advance written authorization from Owner. Engineer shall cease performing or furnishing such Additional Services upon receipt of written notice from Owner. 1. Services in connection with work change directives and change orders to reflect changes requested by Owner. 2. Services resulting from significant delays, changes, or price increases occurring as a direct or indirect result of materials, equipment, or energy shortages. 3. Additional or extended services during construction made necessary by (1) emergencies or acts of God endangering the Work (advance notice not required), (2) the presence at the Site of any hazardous material or items of historical or cultural significance, (3) Work damaged by fire or other cause during construction, (4) a significant amount of defective,

Sources

  • sharepoint (K-6 - Profession Services Agreement - MSA - North Park Road Construction Observation.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.