contract agreement · K-6

K-6 - Profession Services Agreement - MSA - North Park Road Construction Observation

Open the PDF Searchable (OCR) PDF

Page 7 of 10

Text read by the vision model; check the PDF for anything that matters.
IV. Subconsultant-Provided Services A. Terracon Consultants, Inc. will provide quality assurance observation and material testing services as described in their proposal (Attachment C). V. Post-Construction Phase A. Upon written authorization or email from Owner during the Post-Construction Phase Engineer shall: 1. Together with Owner, visit the Project to observe any apparent defects in the Work, assist Owner in consultations and discussions with Contractor concerning correction of such defects, and make recommendations as to replacement or correction of defective Work, if any. 2. Together with Owner or Owner’s representative, visit the Project within one month before the end of the correction period to ascertain whether any portion of the Work is subject to correction. B. The Post-Construction Phase services may commence during the Construction Phase and will terminate no more than 12 months after the commencement of the Construction Contract’s correction period. VI. Additional Services A. Additional Services Requiring Owner’s Written Authorization: If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services of the types listed below. These services are not included in the estimated fee. 1. Provide Construction Staking for earthwork or paving to allow construction of subgrade, subbase, and concrete paving to design/proposed elevation as shown in contract documents. 2. Services resulting from significant changes in the scope, extent, or character of the portions of the Project designed or specified by Engineer or its design requirements including, but not limited to, changes in size, complexity, schedule, character of construction, or method of financing; and revising previously accepted studies, reports, Drawings, Specifications, or Contract Documents when such revisions are required by changes in Laws and Regulations enacted subsequent to the Effective Date or are due to any other causes beyond Engineer's control. 3. Providing renderings or models for Owner’s use. 4. Preparing for, coordinating with, participating in and responding to structured independent review processes, including, but not limited to, construction management, cost estimating, project peer review, value engineering, and constructability review

Sources

  • sharepoint (K-6 - Profession Services Agreement - MSA - North Park Road Construction Observation.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.