ON-GOING PROJECTS
REVERSE OSMOSIS WATER TREATMENT PLANT DESIGN – CLINT WIENEN
This project is currently out for bids. A non-mandatory pre-bid meeting was held on March 18th. The bid
opening is scheduled for April 10th at 2:00 p.m. at City Hall.
HIGHWAY 6 CONCEPT AND COST ESTIMATE – JAMES WATTERS
PreDesign Agreement between City and DOT has been finalized and signed
Public Engagement meeting for the project is tentatively scheduled for Tuesday April 22nd and held at City
Hall.
SYSTEMWIDE SANITARY SEWER MODEL – ERIC THOMPSON
System modeling effort has begun.
MSA will be identifying flow meter locations and install in early April to begin collecting data. Manhole
locations will be verified with City Staff. Flow meters will be checked after large storm events and every 2-
3 weeks at regular intervals to determine when they can be removed.
PROJECT UPDATE
Page 1 of 4
Sources
- sharepoint (M-9 - City Engineer Report.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.