I-8 - Resolution 2025-058 - Updated 80-380 Commerce Park Developer's Agreement - 80-380 Commerce Park Addition
Dated May 20, 2025City Council — regular meeting, May 20, 2025 13 pages
Res. 2025-058, Res. 2025-042
Page 4 of 13
Text from the PDF text layer; check the PDF for anything that matters.and surveying and staking.
C. Standard Requirements. Further, the Subdivider agrees that:
1. All streets being a part of the public improvements and shown on the plat
will be constructed of concrete paving with concrete curb and gutter, which will be
shown on the construction plans, to be approved by the City Engineer, and will be
dedicated to the City.
2. The Subdivider shall provide for the installation of all electric lines, street
lights, gas mains, telephone lines and other utility facilities that are necessary at the
Subdivider’s sole cost.
3. Any decorative street lighting shall be approved by the City and installed
at the Subdivider’s sole cost.
4. At such time as building construction occurs on a “Lot” (as defined in the
Tiffin Subdivision Ordinance), but in no event later than five (5) years from the date the
final subdivision plat of any portion of the Subdivision in which any given Lot is located
is recorded with the Johnson County, Iowa Recorder, the Subdivider shall install
sidewalks in the any given Part abutting said Lots located within any given Part per the
widths approved on the plat, in accordance with the plans and specifications of the City,
and subject to inspections by the City Engineer or designate, unless otherwise shown on
the plat or otherwise specified in this agreement. The sidewalk to be installed south of
Village Dr, between Lot 4 and S Park Road, shall be installed by the owner of Lot 4
when building construction occurs on Lot 4.
5. The Subdivider shall submit to the City, for approval by the City
Engineer, a storm water management plan which will identify the drainage of the
Subdivision and specify the manner in which storm water, drainage and runoff will be
accommodated. The Subdivider agrees to dispose of all storm water through the
approved storm water and drainageway system as set forth in the storm water
management plan. The design and construction of the storm water detention basin(s)
shall be in compliance with the City’s current storm water management ordinances and
policies and shall be constructed on Lot 3,Lot 4 and Lot 7 as shown on the plat.
6. The Subdivider shall provide any water, sewer, utility and drainage
easements as shown on the approved final plat.
7. Any wells shall be abandoned in accordance with applicable local, state
and federal laws and regulations.
8. Subdivider acknowledges that portions of Lot 3, Lot 4 and Lot 7 will be
storm water detention areas and will be subject to storm water detention easements
providing for types of detention basins as approved by the City Engineer. The Subdivider
may create an owners’ association, which would have the sole responsibility of maintaining
the storm water detention areas on Lot 3 and Lot 4 and Lot 7. The City shall have no
obligation for the maintenance of any portion of Lot 3, Lot 4, or Lot 7. If the Subdivision