WS - C - Village Drive Extension Cost Estimates
Page 7 of 7
Text read by the vision model; check the PDF for anything that matters.Tiffin, IA
<table>
<tr>
<th>Village Drive Summary</th>
<th>City Portion</th>
<th>Villages L.C.<br>Villages when shared</th>
</tr>
<tr>
<td>Total Project Cost *</td>
<td>$2,433,880.50</td>
<td></td>
</tr>
<tr>
<td>Village Drive adjacent to Water Tower</td>
<td>$411,884.60</td>
<td>$56,034.60</td>
</tr>
<tr>
<td>Adjacent to Burd Property</td>
<td>$52,534.05</td>
<td>$47,743.05<br>City can asses the Burd lot for future development</td>
</tr>
<tr>
<td>Water Main</td>
<td>$370,190.50</td>
<td>$223,536.10</td>
<td>$146,654.40</td>
</tr>
<tr>
<td>Paving</td>
<td>$744,330.65</td>
<td>$163,767.00</td>
<td>$580,563.65</td>
</tr>
<tr>
<td>Sidewalk 10' trail extention</td>
<td>$142,227.45</td>
<td>$88,583.40</td>
<td>$53,644.05</td>
</tr>
<tr>
<td>Totals</td>
<td></td>
<td>$940,305.15</td>
<td>$884,639.75</td>
</tr>
</table>
Total
<table>
<tr>
<td>Villages</td>
<td>$1,493,575.35</td>
</tr>
<tr>
<td>City</td>
<td>$940,305.15</td>
</tr>
<tr>
<td>Total Check</td>
<td>$2,433,880.50</td>
</tr>
<tr>
<td>Villages Credit on costs for TIF</td>
<td>$(500,000.00)</td>
</tr>
<tr>
<td>Total Cost Developer</td>
<td>$993,575.35</td>
</tr>
<tr>
<td>Total Costs City</td>
<td>$1,440,305.15</td>
</tr>
</table>
* If bids are lower each costs will be reduced within its category
Propose to start in Spring 2024 and City can budget 1/2 in 24 1/2 in 2025
Sources
- sharepoint (WS - C - Village Drive Extension Cost Estimates.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (WS - C - Village Drive Extension Cost Estimates.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.