Text read by the vision model; check the PDF for anything that matters.ESTIMATED CONSTRUCTION COSTS
PROJECT: VILLAGE DRIVE EXTENSION - ENTIRE ROAD
LOCATION: Tiffin, Iowa
DATE: February 7, 2024
<table>
<tr>
<th>ITEM NO.</th>
<th>ITEM CODE</th>
<th>DESCRIPTION</th>
<th>UNIT</th>
<th>EST Quant.</th>
<th>UNIT PRICE</th>
<th>TOTAL PRICE</th>
</tr>
<tr>
<td>1</td>
<td>2010-C</td>
<td>Clearing and Grubbing</td>
<td>LS</td>
<td>1</td>
<td>$1,500.00</td>
<td>$1,500.00</td>
</tr>
<tr>
<td>2</td>
<td>2010-D</td>
<td>Strip, Stockpile, and Repsread Topsoil (6")</td>
<td>CY</td>
<td>9,860</td>
<td>$8.60</td>
<td>$84,796.00</td>
</tr>
<tr>
<td>3</td>
<td>2010-E</td>
<td>Excavation, Class 10</td>
<td>CY</td>
<td>23,000</td>
<td>$3.40</td>
<td>$78,200.00</td>
</tr>
<tr>
<td>4</td>
<td>2010-G</td>
<td>Subgrade Prep, Roadway and North Sidewalk</td>
<td>SY</td>
<td>15,530</td>
<td>$1.95</td>
<td>$30,283.50</td>
</tr>
<tr>
<td>5</td>
<td>2010-I</td>
<td>Subbase, Modified, 6-inch Thick (Street and North Side Sidewalk)</td>
<td>SY</td>
<td>15,530</td>
<td>$7.40</td>
<td>$114,922.00</td>
</tr>
<tr>
<td>6</td>
<td>2010-L</td>
<td>Compaction Testing</td>
<td>LS</td>
<td>2</td>
<td>$3,755.00</td>
<td>$7,510.00</td>
</tr>
<tr>
<td>7</td>
<td>4010-A</td>
<td>Sanitary Sewer Gravity Main, PVC, 8" Dia.</td>
<td>LF</td>
<td>2,000</td>
<td>$48.80</td>
<td>$97,600.00</td>
</tr>
<tr>
<td>8</td>
<td>4010-E</td>
<td>Sanitary Sewer Service, 6" Dia. PVC</td>
<td>LF</td>
<td>100</td>
<td>$102.00</td>
<td>$10,200.00</td>
</tr>
<tr>
<td>9</td>
<td>4020-A</td>
<td>Storm Sewer Main, 15" RCP</td>
<td>LF</td>
<td>905</td>
<td>$72.10</td>
<td>$65,250.50</td>
</tr>
<tr>
<td>10</td>
<td>4020-A</td>
<td>Storm Sewer Main, 18" RCP</td>
<td>LF</td>
<td>1,100</td>
<td>$76.70</td>
<td>$84,370.00</td>
</tr>
<tr>
<td>11</td>
<td>4040-A</td>
<td>Subdrain Tile, HDPE With Porous Backfill, 6" Dia.</td>
<td>LF</td>
<td>3,001</td>
<td>$16.30</td>
<td>$48,916.30</td>
</tr>
<tr>
<td>12</td>
<td>4040-C</td>
<td>Subdrain Cleanout, SUDAS 4040.232, Type B</td>
<td>EA</td>
<td>2</td>
<td>$1,100.00</td>
<td>$2,200.00</td>
</tr>
<tr>
<td>13</td>
<td>5010-A</td>
<td>Connection to Existing Water Main</td>
<td>EA</td>
<td>2</td>
<td>$450.00</td>
<td>$900.00</td>
</tr>
<tr>
<td>14</td>
<td>5010-A</td>
<td>Water Main With Fittings, Trenched, 12" Dia. PVC</td>
<td>LF</td>
<td>195</td>
<td>$85.00</td>
<td>$16,575.00</td>
</tr>
<tr>
<td>15</td>
<td>5010-A</td>
<td>Water Main With Fittings, Trenched, 16" Dia. PVC</td>
<td>LF</td>
<td>2,349</td>
<td>$134.50</td>
<td>$315,940.50</td>
</tr>
<tr>
<td>16</td>
<td>5010-D</td>
<td>Water Service, PVC, 8" Dia.</td>
<td>LF</td>
<td>416</td>
<td>$50.10</td>
<td>$20,841.60</td>
</tr>
<tr>
<td>17</td>
<td>5020-B</td>
<td>MJ Gate Valve, 8" Dia. complete with Valve Box (Service Line)</td>
<td>EA</td>
<td>4</td>
<td>$2,400.00</td>
<td>$9,600.00</td>
</tr>
<tr>
<td>18</td>
<td>5020-B</td>
<td>MJ Butterfly Valve, 15" Dia. complete with Valve Box</td>
<td>EA</td>
<td>7</td>
<td>$4,925.00</td>
<td>$34,475.00</td>
</tr>
<tr>
<td>19</td>
<td>5020-C</td>
<td>Fire Hydrant Assembly</td>
<td>EA</td>
<td>8</td>
<td>$7,200.00</td>
<td>$57,600.00</td>
</tr>
<tr>
<td>20</td>
<td>6010-A</td>
<td>Sanitary Manhole, Type SW-301, 48" Dia. (With Chimney Seal)</td>
<td>EA</td>
<td>6</td>
<td>$5,400.00</td>
<td>$32,400.00</td>
</tr>
<tr>
<td>21</td>
<td>6010-G</td>
<td>Connection to Existing Sanitary Sewer Stub</td>
<td>EA</td>
<td>2</td>
<td>$410.00</td>
<td>$820.00</td>
</tr>
<tr>
<td>22</td>
<td>6010-B</td>
<td>Storm Intake Top, Type SW-507</td>
<td>EA</td>
<td>1</td>
<td>$2,650.00</td>
<td>$2,650.00</td>
</tr>
<tr>
<td>23</td>
<td>6010-B</td>
<td>Storm Intake, Type SW-509</td>
<td>EA</td>
<td>15</td>
<td>$8,138.00</td>
<td>$122,070.00</td>
</tr>
<tr>
<td>24</td>
<td>7010-A</td>
<td>Pavement, Mainline PCC, 8" Thick (40' assumed)</td>
<td>SY</td>
<td>11,317</td>
<td>$55.30</td>
<td>$625,277.10</td>
</tr>
<tr>
<td>25</td>
<td>7030-E</td>
<td>Sidewalk, PCC, 6" (10' Wide, North Side Only)</td>
<td>SY</td>
<td>2,757</td>
<td>$41.50</td>
<td>$116,075.50</td>
</tr>
<tr>
<td>26</td>
<td>7040-H</td>
<td>Concrete Pavement Removal</td>
<td>LS</td>
<td>1</td>
<td>$920.50</td>
<td>$920.50</td>
</tr>
<tr>
<td>27</td>
<td>8030-A</td>
<td>Temporary Traffic Control</td>
<td>LS</td>
<td>2</td>
<td>$500.00</td>
<td>$1,000.00</td>
</tr>
<tr>
<td>28</td>
<td>9010-B</td>
<td>Hydraulic Seeding, Fertilizing, and Mulching</td>
<td>Ac</td>
<td>9.0</td>
<td>$3,250.00</td>
<td>$29,250.00</td>
</tr>
<tr>
<td>29</td>
<td>9040-A</td>
<td>SWPPP Inspections</td>
<td>MO</td>
<td>6</td>
<td>$350.00</td>
<td>$2,100.00</td>
</tr>
<tr>
<td>30</td>
<td>9040-E</td>
<td>Wood Excelsior Mat for Side Slopes</td>
<td>SQ</td>
<td>324</td>
<td>$15.00</td>
<td>$4,860.00</td>
</tr>
<tr>
<td>31</td>
<td>9040-N</td>
<td>Filter Sock, Install and Removal</td>
<td>LF</td>
<td>500</td>
<td>$5.00</td>
<td>$2,500.00</td>
</tr>
<tr>
<td>32</td>
<td>9040-N</td>
<td>Silt Fence, Install and Removal</td>
<td>LF</td>
<td>2700</td>
<td>$3.00</td>
<td>$8,100.00</td>
</tr>
<tr>
<td>33</td>
<td>9040-O</td>
<td>Stabilized Construction Entrance</td>
<td>EA</td>
<td>2</td>
<td>$2,000.00</td>
<td>$4,000.00</td>
</tr>
<tr>
<td>34</td>
<td>9040-O</td>
<td>Rock Turnaround</td>
<td>TON</td>
<td>425</td>
<td>$28.20</td>
<td>$11,985.00</td>
</tr>
<tr>
<td>35</td>
<td>9040-T</td>
<td>Inlet Protection Device, Surface Applied</td>
<td>EA</td>
<td>18</td>
<td>$100.00</td>
<td>$1,800.00</td>
</tr>
<tr>
<td>36</td>
<td>9071-A</td>
<td>Retaining Wall, Segmental Block</td>
<td>SF</td>
<td>6,470</td>
<td>$55.00</td>
<td>$355,850.00</td>
</tr>
<tr>
<td>37</td>
<td>11020-A</td>
<td>Mobilization</td>
<td>LS</td>
<td>2</td>
<td>$14,271.00</td>
<td>$28,542.00</td>
</tr>
<tr>
<td>38</td>
<td>11050-A</td>
<td>Concrete Washout</td>
<td>EA</td>
<td>2</td>
<td>$1,000.00</td>
<td>$2,000.00</td>
</tr>
<tr>
<td colspan="6">TOTAL =</td>
<td>$2,433,880.50</td>
</tr>
</table>
Sources
- sharepoint (WS - C - Village Drive Extension Cost Estimates.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (WS - C - Village Drive Extension Cost Estimates.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.