contract agreement · K-3
K-3 - Pay Estimate 5 - Boomerang - Potter Creek Sewer Interceptor - Final
Page 2 of 2
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>ITEM NO.</th>
<th>CONTRACT ITEMS</th>
<th>UNIT</th>
<th>EST QTY</th>
<th>UNIT PRICE</th>
<th>CONTRACTOR's BID PRICE</th>
<th colspan="2">Pay Period #5</th>
<th>TOTAL TO DATE</th>
</tr>
<tr>
<td colspan="6">(NOTE: Items shown in BOLD are the ADDENDUM CHANGES)</td>
<td colspan="2"></td>
<td></td>
</tr>
<tr>
<td>1</td>
<td>CLEARING & GRUBBING</td>
<td>UNITS</td>
<td>1,207.40</td>
<td>$39.00</td>
<td>$47,088.60</td>
<td>S</td>
<td>-</td>
<td>1,207.40 $ 47,088.60</td>
</tr>
<tr>
<td>2</td>
<td>CLEARING & GRUBBING</td>
<td>ACRE</td>
<td>0.75</td>
<td>$11,000.00</td>
<td>$8,250.00</td>
<td>S</td>
<td>-</td>
<td>0.75 $ 8,250.00</td>
</tr>
<tr>
<td>3</td>
<td>SANITARY SEWER, TRENCHED, 8 IN DIA.</td>
<td>LF</td>
<td>202.00</td>
<td>$94.00</td>
<td>$18,988.00</td>
<td>S</td>
<td>-</td>
<td>218.00 $ 20,922.00</td>
</tr>
<tr>
<td>4</td>
<td>SANITARY SEWER, TRENCHED, 12 IN DIA.</td>
<td>LF</td>
<td>1,280.00</td>
<td>$124.00</td>
<td>$157,920.00</td>
<td>S</td>
<td>-</td>
<td>1,280.00 $ 157,920.00</td>
</tr>
<tr>
<td>5</td>
<td>SANITARY SEWER, TRENCHED, 12 IN DIA, RJ</td>
<td>LF</td>
<td>277.00</td>
<td>$142.00</td>
<td>$39,254.00</td>
<td>S</td>
<td>-</td>
<td>277.00 $ 39,254.00</td>
</tr>
<tr>
<td>6</td>
<td>SANITARY SEWER, TRENCHED, 12 IN DIA, RJ</td>
<td>LF</td>
<td>400.00</td>
<td>$145.00</td>
<td>$58,000.00</td>
<td>S</td>
<td>-</td>
<td>400.00 $ 58,000.00</td>
</tr>
<tr>
<td>7</td>
<td>SANITARY SEWER, TRENCHED, 12 IN DIA, RJ WITH CASING</td>
<td>LF</td>
<td>390.00</td>
<td>$330.00</td>
<td>$129,700.00</td>
<td>S</td>
<td>-</td>
<td>390.00 $ 129,700.00</td>
</tr>
<tr>
<td>8</td>
<td>REMOVAL OF EXISTING SANITARY SEWER, 8 IN DIA.</td>
<td>LF</td>
<td>3.00</td>
<td>$200.00</td>
<td>$600.00</td>
<td>S</td>
<td>-</td>
<td>5.20 $ 1,040.00</td>
</tr>
<tr>
<td>9</td>
<td>REMOVAL OF EXISTING SANITARY SEWER, 15 IN DIA.</td>
<td>LF</td>
<td>400.00</td>
<td>$35.00</td>
<td>$14,000.00</td>
<td>S</td>
<td>-</td>
<td>400.00 $ 14,000.00</td>
</tr>
<tr>
<td>10</td>
<td>BYPASS PUMPING</td>
<td>LS</td>
<td>1.00</td>
<td>$5,000.00</td>
<td>$5,000.00</td>
<td>S</td>
<td>-</td>
<td>1.00 $ 5,000.00</td>
</tr>
<tr>
<td>11</td>
<td>MANHOLE, SW-301, 48 IN.</td>
<td>EACH</td>
<td>13.00</td>
<td>$7,500.00</td>
<td>$97,500.00</td>
<td>S</td>
<td>-</td>
<td>13.00 $ 97,500.00</td>
</tr>
<tr>
<td>12</td>
<td>CONNECTION TO EXISTING MANHOLE</td>
<td>EACH</td>
<td>14.00</td>
<td>$2,500.00</td>
<td>$35,000.00</td>
<td>S</td>
<td>-</td>
<td>14.00 $ 35,000.00</td>
</tr>
<tr>
<td>13</td>
<td>REMOVE SANITARY MANHOLE</td>
<td>EACH</td>
<td>6.00</td>
<td>$1,000.00</td>
<td>$6,000.00</td>
<td>S</td>
<td>-</td>
<td>6.00 $ 6,000.00</td>
</tr>
<tr>
<td>14</td>
<td>REMOVE EXISTING SIDEWALK</td>
<td>SY</td>
<td>225.00</td>
<td>$25.00</td>
<td>$5,625.00</td>
<td>S</td>
<td>-</td>
<td>277.00 $ 6,925.00</td>
</tr>
<tr>
<td>15</td>
<td>REMOVE EXISTING DRIVEWAY</td>
<td>SY</td>
<td>93.00</td>
<td>$25.00</td>
<td>$2,325.00</td>
<td>S</td>
<td>-</td>
<td>134.00 $ 3,350.00</td>
</tr>
<tr>
<td>16</td>
<td>SIDEWALK, PCC, 4-INCH</td>
<td>SY</td>
<td>200.00</td>
<td>$68.00</td>
<td>$13,600.00</td>
<td>S</td>
<td>-</td>
<td>225.00 $ 15,300.00</td>
</tr>
<tr>
<td>17</td>
<td>REPLACE SIDEWALK</td>
<td>SY</td>
<td>25.00</td>
<td>$100.00</td>
<td>$2,500.00</td>
<td>S</td>
<td>-</td>
<td>52.00 $ 5,200.00</td>
</tr>
<tr>
<td>18</td>
<td>DETECTABLE WARNINGS</td>
<td>SF</td>
<td>40.00</td>
<td>$50.00</td>
<td>$2,000.00</td>
<td>S</td>
<td>-</td>
<td>40.00 $ 2,000.00</td>
</tr>
<tr>
<td>19</td>
<td>DRIVEWAY, PCC, 6-INCH</td>
<td>SY</td>
<td>93.00</td>
<td>$76.00</td>
<td>$7,068.00</td>
<td>S</td>
<td>-</td>
<td>134.00 $ 10,184.00</td>
</tr>
<tr>
<td>20</td>
<td>PATCHES, FULL DEPTH, FINISH, PCC</td>
<td>SY</td>
<td>165.00</td>
<td>$140.00</td>
<td>$23,100.00</td>
<td>S</td>
<td>-</td>
<td>204.00 $ 28,560.00</td>
</tr>
<tr>
<td>21</td>
<td>PATCHES, SUBBASE</td>
<td>SY</td>
<td>165.00</td>
<td>$22.00</td>
<td>$3,630.00</td>
<td>S</td>
<td>-</td>
<td>204.00 $ 4,488.00</td>
</tr>
<tr>
<td>22</td>
<td>SLOPE PROTECTION, WOOD EXCELSIOR MAT</td>
<td>SQ</td>
<td>1,133.00</td>
<td>$11.00</td>
<td>$12,463.00</td>
<td>S</td>
<td>-</td>
<td>423.00 $ 4,675.00</td>
</tr>
<tr>
<td>23</td>
<td>STABILIZING CROP SEEDING, FERTILIZING, (URBAN)</td>
<td>ACRE</td>
<td>1.30</td>
<td>$600.00</td>
<td>$780.00</td>
<td>S</td>
<td>-</td>
<td>1.30 $ 8,322.00</td>
</tr>
<tr>
<td>24</td>
<td>CONVENTIONAL SEEDING, FERT., AND MULCHING (URBAN)</td>
<td>ACRE</td>
<td>2.60</td>
<td>$2,400.00</td>
<td>$6,240.00</td>
<td>S</td>
<td>-</td>
<td>3.68 $ 8,832.00</td>
</tr>
<tr>
<td>25</td>
<td>SWPPP MANAGEMENT</td>
<td>LS</td>
<td>1.00</td>
<td>$1,000.00</td>
<td>$1,000.00</td>
<td>0.10</td>
<td>100.00</td>
<td>1.00 $ 1,000.00</td>
</tr>
<tr>
<td>26</td>
<td>PERIMETER+SLOPE SEDIMENT CONTROL DEVICE 9 INCH</td>
<td>LF</td>
<td>3,850.00</td>
<td>$25.00</td>
<td>$96,250.00</td>
<td>S</td>
<td>-</td>
<td>2,596.00 $ 6,490.00</td>
</tr>
<tr>
<td>27</td>
<td>INLET PROTECTION DEVICE</td>
<td>EACH</td>
<td>12.00</td>
<td>$75.00</td>
<td>$975.00</td>
<td>S</td>
<td>-</td>
<td>6.00 $ 450.00</td>
</tr>
<tr>
<td>28</td>
<td>REPLACEMENT FENCE</td>
<td>LF</td>
<td>240.00</td>
<td>$10.00</td>
<td>$2,400.00</td>
<td>S</td>
<td>-</td>
<td>240.00 $ 2,400.00</td>
</tr>
<tr>
<td>29</td>
<td>Mobilization</td>
<td>LS</td>
<td>1.00</td>
<td>$246,000.00</td>
<td>$246,000.00</td>
<td>S</td>
<td>-</td>
<td>1.00 $ 246,000.00</td>
</tr>
<tr>
<td>30</td>
<td>TRAFFIC CONTROL</td>
<td>LS</td>
<td>1.00</td>
<td>$10,000.00</td>
<td>$10,000.00</td>
<td>S</td>
<td>-</td>
<td>1.00 $ 10,000.00</td>
</tr>
<tr>
<td>31</td>
<td>DEWATERING</td>
<td>LS</td>
<td>1.00</td>
<td>$5,000.00</td>
<td>$5,000.00</td>
<td>S</td>
<td>-</td>
<td>1.00 $ 5,000.00</td>
</tr>
<tr>
<td>32</td>
<td>SANITARY SEWER ACCEPTANCE TESTING</td>
<td>LS</td>
<td>1.00</td>
<td>$15,000.00</td>
<td>$15,000.00</td>
<td>0.10</td>
<td>1,500.00</td>
<td>1.00 $ 15,000.00</td>
</tr>
<tr>
<td>33</td>
<td>RAILROAD LTD</td>
<td>LS</td>
<td>1.00</td>
<td>$5,000.00</td>
<td>$5,000.00</td>
<td>S</td>
<td>-</td>
<td>1.00 $ 5,000.00</td>
</tr>
<tr>
<td>34</td>
<td>INTERNAL DROP CONNECTION</td>
<td>EACH</td>
<td>1.00</td>
<td>$4,000.00</td>
<td>$4,000.00</td>
<td>S</td>
<td>-</td>
<td>1.00 $ 4,000.00</td>
</tr>
<tr>
<td colspan="6">TOTAL OF THE BASE BID (Total of Items 1-34):</td>
<td colspan="2">$1,067,857.60</td>
<td>$1,600.00 $1,085,664.60</td>
</tr>
<tr>
<td colspan="6">CO1 SANITARY SEWER, TRENCHED, 12 IN DIA, RJ</td>
<td>LF</td>
<td>-265.00</td>
<td>$140.00</td>
<td>($37,100.00)</td>
<td>S</td>
<td>-</td>
<td></td>
</tr>
<tr>
<td colspan="6">#35 SANITARY SEWER, TRENCHED, 12 IN DIA, C-900</td>
<td>LF</td>
<td>265.00</td>
<td>$126.00</td>
<td>$33,390.00</td>
<td>S</td>
<td>-</td>
<td>265.00 $ 33,390.00</td>
</tr>
<tr>
<td colspan="6">CONNECTION OF EXISTING SEWER SERVICE</td>
<td>LS</td>
<td>1.00</td>
<td>$2,200.00</td>
<td>$2,200.00</td>
<td>S</td>
<td>-</td>
<td>1.00 $ 2,200.00</td>
</tr>
<tr>
<td colspan="6">REPLACEMENT OF UNSUITABLE BACKFILL</td>
<td>TON</td>
<td>540.00</td>
<td>$2,17</td>
<td>$1,149,400.00</td>
<td>S</td>
<td>-</td>
<td>540.00 $ 1,149,400.00</td>
</tr>
<tr>
<td colspan="6">CO2 Rip-Rap at IDOT RCB Culvert</td>
<td>TON</td>
<td>50.00</td>
<td>$122.00</td>
<td>$6,100.00</td>
<td>S</td>
<td>-</td>
<td>43.00 $ 5,246.00</td>
</tr>
<tr>
<td colspan="6">CO3 Deduct from Retaining for Street Repair of Street</td>
<td>LS</td>
<td>1.00</td>
<td>($3,000.00)</td>
<td>($3,000.00)</td>
<td>1.00</td>
<td>(3,000.00)</td>
<td>1.00 (3,000.00)</td>
</tr>
<tr>
<td colspan="6">CHANGE ORDER SUB-TOTAL</td>
<td></td>
<td></td>
<td>$8,539.80</td>
<td>(3,000.00)</td>
<td>$4,478.80</td>
</tr>
<tr>
<td colspan="6">AMOUNT EARNED TOTAL</td>
<td></td>
<td></td>
<td>($1,400.00)</td>
<td></td>
<td>1,130,450.40</td>
</tr>
<tr>
<td>9998</td>
<td>Materials Stored on-site</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>S</td>
<td>-</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>9999</td>
<td>Materials Installed on-site (Deduct)</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>S</td>
<td>-</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td colspan="6">MATERIALS SUB-TOTAL</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td colspan="6">TOTAL</td>
<td></td>
<td></td>
<td>($1,400.00)</td>
<td></td>
<td>1,130,450.40</td>
</tr>
</table>
Sources
- sharepoint (K-3 - Pay Estimate 5 - Boomerang - Potter Creek Sewer Interceptor - Final.pdf) — where it was found ↗ first seen Oct 12, 2026