resolution · I-3
I-3 - Resolution 2021-057 - 28E Agreement for CIPCO Line Cost Share with North Liberty
Page 7 of 12
Text read by the vision model; check the PDF for anything that matters.Exhibit A
TEMPORARY CONSTRUCTION EASEMENT (37,219 SF)(0.88 AC)
PERMANENT EASEMENT (9,217 SF)(0.21 AC)
PROPOSED RIGHT-OF-WAY ACQUISITION (32,859 SF)(0.75 AC)
REMOVE TEMPORARY PAVEMENT INSTALLED BY IDOT
CONNECT TO FOREVERGREEN ROAD IMPROVEMENTS (DOT)
TEMPORARY CONSTRUCTION EASEMENT (87,748 SF)(2.01 AC)
PERMANENT EASEMENT (15,012 SF)(0.34 AC)
END PARK ROAD IMPROVEMENTS (BY OTHERS)
PROPOSED RIGHT-OF-WAY ACQUISITION (162,985 SF)(3.74 AC)
TEMPORARY CONSTRUCTION EASEMENT (34,601 SF)(0.79 AC)
PERMANENT EASEMENT (21,758 SF)(0.50 AC)
CONNECT TO EXISTING FOREVERGREEN ROAD
FOREVERGREEN ROAD IMPROVEMENTS
TIFFIN
JOHNSON COUNTY
IOWA
MMS CONSULTANTS, INC.
Date: 10-10-18
Designed by: Field Book No:
Drawn by: JMB Scale: 1=100
Checked by: KJB Sheet No:
Project No: IOWA CITY 10225-002
Sheet No: 1 of 1
Sources
- sharepoint (I-3 - Resolution 2021-057 - 28E Agreement for CIPCO Line Cost Share with North Liberty.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.