plat site plan

WS - C - Prairie Village Part Three - Revised OPD Site Plan

Dated October 5, 2021City Council — work session, October 5, 2021 3 pages

Open the PDF

Page 2 of 3

Text from the PDF text layer; check the PDF for anything that matters.
OMER ST. THOMAS STREET ELLA AVE. 3.5' 56.7' 60.0' 60.0' 60.0' 60.0' 60.0' 60.0' 67.1' 69.4' 53.4' 19. 6 ' 70.2' 61.3' 60.0' 60.3' 60.0' 43.6' 21.5' 1 11,002 SF 37.7' building strong communities. 47.6' 61.9' 0.0' 66.0' 21.5' 20.8' 61.9' 1360 NW 121ST. Street 120.9' 66.0' Clive, Iowa 50325 153.2' 100.1' 108.6' 153.2' 153.2' 106 153.2' 147.8' 107 80.1' 153.2' 108 142.7' 153.1' 109 153.1' 105 135.0' 103 104 111 112 135.0' 137.0' 135.0' 99 100 101 102 8,392 SF 8,649 SF 9,040 SF 9,191 SF 9,190 SF 9,190 SF 9,189 SF 113 515-964-1229 7,885 SF 8,101 SF 8,101 SF 8,798 SF 8,530 SF 9,188 SF 10,179 SF 77.3' fax 515-964-2370 74.7' 65.7' 114 65.0' 71.3' 8,167 SF 91.0' 2 91.0' 11,003 SF 125.0' 31. 4' ' 31. .4 39.0' 60.0' 60.0' 65.0' 60.0' 39.3' 31 4' NOTICE: ' 41.0' 60.0' .4 60.0' 60.0' 60.0' 60.0' 60.0' 60.0' 31 McClure Engineering Company waives any and all 47.0' 120.9' responsibility and liability for problems which arise from 60.0' 115 60.0' failure to follow these Plans, Specifications, and the 7,500 SF engineering intent they convey, or for problems which arise from failure to obtain and/or follow the engineers guidance MAILBOX CLUSTER E. BEAR DR. with respect to any errors, omissions, inconsistencies, ambiguities, or conflicts which are alleged. MAILBOX CLUSTER 80.0' 3 125.0' 80.0' COPYRIGHT: 9,668 SF Copyright and property rights in these documents are expressly reserved by McClure Engineering Company. No 43.5' reproductions, changes, or copies in any manner shall be 4' 60.0' 60.0' 60.0' 60.0' 116 60.0' 65.0' 60.0' 60.0' 60.0' 60.0' 60.0' made without obtaining prior written consent from McClure 60.0' 65.0' 60.0' 31. 60.0' 60.0' 43.7' 31 7,500 SF Engineering Company. .4' 120.8' 125.0' 65.0' 91.0' 117 65.0' 4 147.5' 91.0' 147.5' 147.5' 98 147.5' 97 147.5' 96 147.5' 95 147.5' 94 147.5' 93 147.5' 92 147.5' 91 8,125 SF 147.5' 10,992 SF 90 147.5' 89 147.5' 88 147.5' 9,284 SF 87 147.5' 8,849 SF 8,849 SF 86 85 127.5' 8,849 SF 9,586 SF 8,849 SF 8,849 SF 8,849 SF 8,849 SF 84 83 8,849 SF 8,849 SF 9,586 SF 8,849 SF 8,849 SF 8,849 SF 9,305 SF 127.5' 125.0' 120.8' 60.0' 118 60.0' 7,500 SF 63.6' 60.0' 60.0' 60.0' 65.0' 60.0' 60.0' 60.0' 60.0' 60.0' 60.0' 65.0' 60.0' 91.0' 5 60.0' 60.0' 63.6' 91.0' 10,986 SF 125.0' 60.0' 60.0' 120.7' 127.5' CONCEPT 127.5' 147.5' 147.5' 147.5' 67 147.5' 68 147.5' 69 147.5' 70 147.5' 71 147.5' 72 147.5' 73 147.5' 74 147.5' 75 147.5' 76 147.5' 77 147.5' 9,293 SF 78 147.5' 8,849 SF 8,849 SF 8,849 SF 9,586 SF 79 80 81 8,849 SF 8,849 SF 8,849 SF 8,849 SF 8,849 SF 8,849 SF 9,586 SF 8,849 SF 8,849 SF 82 8,849 SF 9,287 SF EXHIBIT 64.1' 82.7' 6 65.0' 9,995 SF 120 65.0' 8,125 SF ' .7 31. 100.4' 31 4' 43.6' 60.0' 60.0' 60.0' 65.0' 60.0' 125.0' 60.0' ' 60.0' 60.0' .4 60.0' 60.0' 65.0' 60.0' 60.0' 60.0' 31 43.5' 60.0' 121 60.0' 66.0' E. GOLDFINCH DR. 7,500 SF 125.0' 100.9' 31 4' 43.5' 60.0' 60.0' 60.0' 65.0' 60.0' 60.0' 60.0' 60.0' 60.0' 60.0' 65.0' .1' 60.0' 31. 60.0' 60.0' 43.6' 31 60.0' 122 60.0' 7,500 SF .4 ' NORTH 88.5' 7 10,482 SF 67.1' 125.0' 120.0' 120.0' 120.0' 66 120.0' 120.0' 64 120.0' 63 120.0' 62 120.0' 61 120.0' 60 120.0' 59 120.0' 58 120.0' 57 120.0' 56 120.0' 7,531 SF 55 120.0' 7,200 SF 7,200 SF 54 53 100.0' 7,800 SF 7,200 SF 7,200 SF 7,200 SF 7,200 SF 7,200 SF 7,200 SF 7,800 SF 52 51 7,200 SF 7,200 SF 7,200 SF 0 25' 50' 100' 390.5' 7,545 SF 100.0' 65.0' 123 65.0' 120.5' 8,125 SF GRAPHIC SCALE 125.0' 63.5' 60.0' 60.0' 60.0' 91.0' 8 65.0' 60.0' 91.0' 60.0' 60.0' 60.0' 60.0' 60.0' 65.0' 10,965 SF 60.0' 60.0' 60.0' 63.5' 60.0' 124 60.0' 7,500 SF PRAIRIE VILLAGE 100.0' 9/30/2021 12:25 PM 120.5' 100.0' 120.0' 120.0' 120.0' 35 120.0' 36 125.0' 120.0' 37 120.0' 38 120.0' 39 120.0' 40 120.0' 41 120.0' 42 120.0' 43 120.0' 44 TIFFIN, IA 120.0' 45 120.0' 7,537 SF 46 120.0' 7,200 SF 7,200 SF 7,200 SF 7,800 SF 47 48 49 7,200 SF 7,200 SF 7,200 SF 7,200 SF 7,200 SF 7,200 SF 7,800 SF 7,200 SF 7,200 SF 50 7,200 SF 7,533 SF 200641 60.0' 125 60.0' 7,500 SF SEPTEMBER 29, 2021 91.0' 9 91.0' 10,959 SF P:\200641\06-Drawings\Civil\Rezoning\Concept Exhibit.dwg REVISIONS 31. 4' 43.5' 60.0' 60.0' 60.0' 65.0' 60.0' 125.0' . 60.0' ' 60.0' 60.0' .4 60.0' 60.0' 65.0' 60.0' 60.0' 60.0' 31 43.5' . . 65.0' 126 65.0' 120.4' MADDIE LANE 8,125 SF . MAILBOX CLUSTER MAILBOX CLUSTER . ENGINEER DRAWN BY 125.0' C SMITH C SMITH 91.0' 10 91.0' 4' 69.9' 91.0' 91.0' 80.0' 10,953 SF 91.0' 91.0' 91.0' 80.0' 91.0' . 91.0' 31 70.1' 31 CHECKED BY FIELD BOOK NO. 60.0' 127 60.0' . 4' 7,500 SF - - DRAWING NO. SHEET NO. 120.3' 118.5' 118.5' 34 125.0' 03 118.5' 33 CP-02 02 118.5' 32 118.5' 31 118.5' 30 118.5' 29 118.5' 28 118.5' 10,569 SF 27 118.5' 10,787 SF 10,787 SF 9,483 SF 26 25 24 98.5' 10,787 SF 10,787 SF 10,787 SF 9,483 SF 10,787 SF 10,787 SF 10,589 SF 98.5' 128

Sources

  • sharepoint (WS - C - Prairie Village Part Three - Revised OPD Site Plan.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.