Consideration of Change Order #6 - Rathje Construction, Original Town Urbanization Project – Motion to Approve
Page 1 of 1
Text read by the vision model; check the PDF for anything that matters.CHANGE ORDER
DATE: 26 June, 2025
Change Order No: 6 (SIX)
Agreement Date: 12/14/2023
PROJECT: Original Town Urbanization – Phase 3 HFC #18218.131
OWNER: Tiffin, IA
CONTRACTOR: Rathje Construction Co.
DESCRIPTION OF CHANGES TO CONTRACT DOCUMENTS:
Unstable subgrade materials have been encountered on the project. An additional 6-inches of subbase material with geogrid is recommended. An area of approximately 300 SY requires Subgrade Stabilization. Prices for this type of work were established in CO#1.
Polymer Grid Subgrade Stabilization 300SY @ $3.50 =$1,050.00
6-Inch Subgrade Stabilization 300SY @ $75.00 =$22,500.00
Additional Excavation Class 10 Waste 50CY @ $12.50 =$625.00
Estimated Total =$24,175.00
CONTRACT PRICE CHANGES:
Original CONTRACT PRICE: $2,134,856.90
CONTRACT with LAST CHANGE ORDER: $2,229,808.00
THIS CHANGE ORDER AMOUNT: $24,175.00
NEW CONTRACT PRICE: $2,253,983.00
CONTRACT TIME CHANGES
CONTRACT TIME (increased)(decreased): 2 Days
NEW Completion Date: September 26, 2025
APPROVALS REQUIRED: To be effective this Order must be approved by the OWNER.
OWNER: ________________________________
CONTRACTOR: Verbally Verified and Approved by Dan Scofield 26 June, 2025
ENGINEER: ________________________________
Sources
- revize: Attachment (0oVxiZEJEsBX6udqNy0vf56A2oSQFo.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (K-3 - Change Order 6 - Rathje Construction - Original Town Phase 3.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-3 Consideration of Change Order #6 - Rathje Construction, Original Town Urbanization...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.