staff report memo · K-3

Consideration of Infrastructure Upsizing Reimbursement for Tiffin West – Honey Lane Development – Motion to Approve — Item Packet

Open the PDF

Page 1 of 3

Text from the PDF text layer; check the PDF for anything that matters.
AGENDA ITEM # K-3 AGENDA INFORMATION TIFFIN CITY COUNCIL COMMUNICATION DATE: July 8, 2025 AGENDA ITEM: Consideration of Infrastructure Upsizing Reimbursement for Tiffin West – Honey Lane Development ACTION: Motion Background As part of the Tiffin West – Honey Lane Development, the developer was required to install public infrastructure including watermain and paving. To accommodate future growth and citywide infrastructure planning, the City requested that the developer upsize certain components beyond what was originally required for the development. Watermain – Upsize The watermain was upsized from an 8-inch diameter to a 12-inch diameter. While an 8-inch main would have been sufficient for the development, the 12-inch main provides increased capacity for future extensions and system-wide reliability. The cost difference between the 8” and 12” watermain was $19,270.00. Paving – Upsize The paving section was also increased from a standard width to 8-inch Portland Cement Concrete (PCC), which provides a more durable surface suitable for higher traffic volumes and heavier loads anticipated in the area over time. The cost for the upsized paving is $12,080.00. Staff Recommendation Staff recommends approval of the infrastructure upsizing reimbursement request for the Tiffin West – Honey Lane Development in the amount of $31,350.00, which includes upsizing costs for both watermain and paving improvements. ATTACHMENTS: -Watermain Invoice -Paving PCC Invoice 1

Sources

  • revize: Item Packet (QrwhVRB8bXdVnyFxxgKTFOz8159L7N.pdf) — where it was found ↗ first seen Oct 12, 2026
  • sharepoint (K-3 - Staff Report - Infrastructure Upsizing Reimbursement for Tiffin West – Honey Lane Development.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: Consideration of Infrastructure Upsizing Reimbursement for Tiffin West – Honey Lane...

This document's details as JSON

Data last updated October 14, 2026. Built from the archive's documents; see how the data is built.