packet

Packet: Regular City Council Meeting (09/16/2025)

Open the PDF

Page 64 of 77

Text from the PDF text layer; check the PDF for anything that matters.
Design/Action Items Accomplishments • Bid package 2 was sent out • Final coordination items between disciplines • ASI-2 has been sent out. This updated bid package 1 submittals to reflect on contract drawings Upcoming Submittals/Design Deliverables • Preliminary pre-engineered building calculations • Rebar and foundation shop drawings • Aggregate pier shop drawing • CMU rebar shop drawing • Long lead MEP equipment submittals Submittals • Working together to determine importance of incoming submittals from above Requests for Information • 7 Total RFI’s • 5 RFI’s this month • 2 Pending answers ‒ 0 over due Areas of Concern / Focus • Staying on top of submittals that are critical to upcoming work • Finalizing color selections of flooring with the owner Get involved, respond with urgency, and work as a team to get the job done. Leverage the strengths of each individual and overcome obstacles as one. Owner Progress Report | 250120 August 2025 Miron Construction Co., Inc. |6

Sources

  • revize: Agenda packet (packet_2025-09-16_909a3a8c-223b-4913-90b6-b5e14c757333.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.