packet
Packet: Regular City Council Meeting (09/16/2025)
Dated September 16, 2025City Council — regular meeting, September 16, 2025 77 pages
Ord. 2006-277, Res. 2025-075
Page 20 of 77
Text from the PDF text layer; check the PDF for anything that matters. CHAPTER 160
FLOOD PLAIN MANAGEMENT
160.01 Definitions 160.05 Flood Plain Management Standards
160.02 Statutory Authority, Findings of Fact 160.06 Variance Procedures
and Purpose 160.07 Nonconforming Uses
160.03 General Provisions 160.08 Penalties for Violation
160.04 Administration 160.09 Amendments
160.01 DEFINITIONS. Unless specifically defined below, words or phrases used in this chapter shall
be interpreted so as to give them the meaning they have in common usage and to give this chapter its most
reasonable application.
1. “Appurtenant structure” means a structure which is on the same parcel of the property as
the principal structure to be insured and the use of which is incidental to the use of the principal
structure
2. “Base flood” means the flood having one percent chance of being equaled or exceeded in
any given year and is also commonly referred to as the “100-year flood.”
3. “Base flood elevation” (BFE) means the elevation floodwaters would reach at a particular
site during the occurrence of a base flood event.
4. “Basement” means any enclosed area of a building which has its floor or lowest level below
ground level (subgrade) on all sides. Also see “lowest floor.”
5. “Development” means any man-made change to improved or unimproved real estate,
including (but not limited to) buildings or other structures, mining, dredging, filling, grading,
paving, excavation, drilling operations or storage of equipment or materials. “Development” does
not include minor projects or routine maintenance of existing buildings and facilities, as defined in
this section. It also does not include gardening, plowing, and similar practices that do not involve
filling or grading.
6. “Enclosed area below lowest floor” means the floor of the lowest enclosed area in a
building when all the following criteria are met:
A. The enclosed area is designed to flood to equalize hydrostatic pressure during flood
events with walls or openings that satisfy the provisions of Section 160.05(1)(D)(1) of this
chapter.
B. The enclosed area is unfinished (not carpeted, drywalled, etc.) and used solely for
low damage potential uses such as building access, parking, or storage.
C. Machinery and service facilities (e.g., hot water heater, furnace, electrical service)
contained in the enclosed area are located at least one foot above the base flood elevation.
D. The enclosed area is not a basement as defined in this section.
7. “Existing construction” means any structure for which the start of construction commenced
before the effective date of the first floodplain management regulations adopted by the community.
8. “Existing factory-built home park or subdivision” means a factory-built home park or
subdivision for which the construction of facilities for servicing the lots on which the factory-built
cty_hr_d_160.doc -1- 4/15/2021
Sources
- revize: Agenda packet (packet_2025-09-16_909a3a8c-223b-4913-90b6-b5e14c757333.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.