packet
Packet: Regular Formal Council Meeting (10/07/2025)
Dated October 7, 2025City Council — regular meeting, October 7, 2025 117 pages
Ord. 2025-521, Ord. 2025-520, Ord. 2017-398, Res. 2025-076, Res. 2025-077, Res. 2025-078, Res. 2025-075, Res. 2025-068
Page 23 of 117
Text from the PDF text layer; check the PDF for anything that matters. (1) Fully enclosed areas below the lowest floor (not including basements) that
are subject to flooding shall be designed to automatically equalize hydrostatic
flood forces on exterior walls by allowing for the entry and exit of floodwaters.
Designs for meeting this requirement must either be certified by a registered
professional engineer or meet or exceed the following minimum criteria:
a. A minimum of two (2) openings, with positioning on at least two
(2) walls, having a total net area of not less than one square inch for every
square foot of enclosed area subject to flooding shall be provided.
b. The bottom of all openings shall be no higher than one foot above
grade.
c. Openings may be equipped with screens, louvers, valves, or other
coverings or devices provided they permit the automatic entry and exit of
floodwaters.
Where the distance between the floor and ceiling of the fully enclosed area below
the “lowest floor” is (FIVE (5) feet or more, the applicant shall be required to sign
and record with the Johnson County Recorder a Non-Conversion Agreement that
ensures the lower enclosed area remains compliant with the criteria outlined in this
subsection.
(2) New and substantially improved structures must be designed (or modified)
and adequately anchored to prevent flotation, collapse, or lateral movement of the
structure resulting from hydrodynamic and hydrostatic loads, including the effects
of buoyancy.
(3) New and substantially improved structures shall be constructed with
electric meter, electrical service panel box, hot water heater, heating, air
conditioning, ventilation equipment (including ductwork), and other similar
machinery and equipment elevated (or in the case on non-residential structures,
optionally floodproofed to) a minimum of one (1) foot above the base flood
elevation.
(4) New and substantially improved structures shall be constructed with
plumbing, gas lines, water/gas meters and other similar service utilities either
elevated (or in the case of non-residential structures, optionally floodproofed to) a
minimum of one (1) foot above the base flood elevation or designed to be
watertight and withstand inundation to such a level.
E. Factory-Built Homes:
(1) All new and substantially improved factory-built homes, including those
placed in existing factory-built home parks or subdivisions, shall be elevated on a
permanent foundation such that the lowest floor of the structure is a minimum of
one foot above the base flood elevation.
(2) All new and substantially improved factory-built homes, including those
placed in existing factory-built home parks or subdivisions, shall be anchored to
resist flotation, collapse, or lateral movement. Anchorage systems may include,
but are not limited to, use of over-the-top or frame ties to ground anchors as
required by the State Building Code.
F. Utility and Sanitary Systems:
(1) On-site waste disposal and water supply systems shall be located or
designed to avoid impairment to the system or contamination from the system
during flooding.
(2) All new and replacement sanitary sewage systems shall be designed to
minimize or eliminate infiltration of flood waters into the system as well as the
discharge of effluent into flood waters. Wastewater treatment facilities (other than
Sources
- revize: Agenda packet (packet_2025-10-07_5ff2f89c-07cb-45dc-8618-9295e210d4d5.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.