packet
Packet: Regular City Council Meeting (11/04/2025)
Dated November 4, 2025City Council — regular meeting, November 4, 2025 121 pages
Ord. 2025-521, Res. 2025-082, Res. 2025-083, Res. 2025-084, Res. 2025-085, Res. 2025-086, Res. 2025-087, Res. 2025-088, Res. 2025-079, Res. 2025-080, Res. 2025-081
Page 28 of 121
Text from the PDF text layer; check the PDF for anything that matters. N. Maximum Damage Potential Development. All new or substantially improved
maximum damage potential development shall have the lowest floor (including basement)
elevated a minimum of one foot above the elevation of the 500-year flood, or together with
attendant utility and sanitary systems, be floodproofed to such a level. When floodproofing
is utilized, a professional engineer registered in the State of Iowa shall certify that the
floodproofing methods used are adequate to withstand the flood depths, pressures,
velocities, impact and uplift forces and other factors associated with the two-tenths percent
annual chance flood; and that the structure, below the two-tenths percent annual chance
flood elevation is watertight with walls substantially impermeable to the passage of water.
A record of the certification indicating the specific elevation (in relation to North American
Vertical Datum 1988) to which any structures are floodproofed shall be maintained by the
Administrator. Where two-tenths percent chance flood elevation data has not been
provided in the Flood Insurance Study, the Iowa Department of Natural Resources shall be
contacted to compute such data. The applicant will be responsible for providing the
Department of Natural Resources with sufficient technical information to make such
determinations.
2. Special Floodway Provisions. In addition to the General Floodplain Standards, development
within the floodway must meet the following applicable standards. The floodway is that portion
of the floodplain which must be protected from developmental encroachment to allow the free
flow of flood waters. Where floodway data has been provided in the Flood Insurance Study,
such data shall be used to define the floodway. Where no floodway data has been provided, the
Department of Natural Resources shall be contacted to provide a floodway delineation. The
applicant will be responsible for providing the Department of Natural Resources with sufficient
technical information to make such determination.
A. No development shall be permitted in the floodway that would result in any increase
in the base flood elevation. Consideration of the effects of any development on flood
levels shall be based upon the assumption that an equal degree of development would
be allowed for similarly situated lands.
B. All development within the floodway shall:
(1) Be consistent with the need to minimize flood damage.
(2) Use construction methods and practices that will minimize flood damage.
(3) Use construction materials and utility equipment that are resistant to flood damage.
C. No development shall affect the capacity or conveyance of the channel or floodway of
any tributary to the main stream, drainage ditch or any other drainage facility or system.
D. Structures, buildings, recreational vehicles, and sanitary and utility systems, if
permitted, shall meet the applicable General Floodplain standards and shall be
constructed or aligned to present the minimum possible resistance to flood flows.
E. Structures, if permitted, shall have a low flood damage potential and shall not be for
human habitation.
F. Storage of materials or equipment that are buoyant, flammable, explosive or injurious
to human, animal or plant life is prohibited. Storage of other material may be allowed
if readily removable from the floodway within the time available after flood warning.
G. Watercourse alterations or relocations (channel changes and modifications) must be
designed to maintain the flood carrying capacity within the altered or relocated portion.
In addition, such alterations or relocations must be approved by the Department of
Natural Resources.
Sources
- revize: Agenda packet (packet_2025-11-04_73ebb6df-1577-4a68-a966-eb391c55ede2.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.