Discussion and Consideration of Change Order #9 – Rathje Construction, Original Town Urbanization Project Phase 3 – Motion to Approve
Page 2 of 2
Text from the PDF text layer; check the PDF for anything that matters.CHANGE ORDER REQUEST
DATE: 10/21/2025
CONTRACT # 0
CHANGE ORDER REQUEST NO. 9
PROJECT: Tiffin Phase 3 Reconstruction Project
CONTRACTOR: Rathje Construction
CONTRACTOR PROJECT MANAGER: Dan Scofield
CITY OF TIFFIN CONSTRUCTION PROJECT MANAGER: Ben Carhoff
DESCRIPTION OF REQUEST:
Bid item # 43 Patches, Full Depth in the estimate reference states that the material shall be HMA Standard Traffic, 1/2" mix. Tab on sheet O.01 HFC-592 shows 272.3 SY of PCC
patch (minus the alley @ HWY 6, did not get removed due to utility conflict). There is no bid item for the PCC Full Depth Patches. This Change order request is to add this item to the
contract. This Unit price includes, but is not limited to, sawing, removing, and disposing of existing pavement and reinforcing; restoring the subgrade; furnishing and installing tie bars
and dowel bars; furnishing and placing the patch material, including the asphalt binder and tack coat; forming and constructing integral curb; surface curing and pavement protection;
joint sawing and filling; and placing backfill and restoring disturbed surfaces. Adding this item will create a deduct in 4 other plan quantity items, #3 Excavation Class 10: 43.3CY@
$13.50=$584.55. #6 Modified Subbase 43.3CY@$42.00= $1818.6. #45 PCC 9" 272.3SY@$78.00=$21,239.4. # 54 Pavement Removal 272.3SY@$9.00=$2,450.70.This item is
needed due to the crews time of the installation is doubled, compared to placing concrete in front of a paving machine. This will all be hand work, including drilling 1.25" epoxy coated
rebar dowels12" on center(RT joint) and 5/8" rigid epoxy coated dowel bars every 36" (BT joint) in by hand and epoxied. Item reference from SUDAS 7040-A-1.08.
SUDAS SPECIFICATION SECTION TO SUPPORT REQUEST, DIVISION 1:
JUSTIFICATION FOR THE REQUEST, WORKING DIVISION:
Working Proposed Increase
Unit Price w/
Line No. Spec. # Item No. Item Description Quantity Unit Unit Price Mark up Days (Decrease) in
Markup
Requested Contract Price
1 7040 A 8019 Full Depth Patch 9" PCC 272.30 SY $165.00 0.00% $165.00 2 $44,929.50
Bid Item Deducts 1.00 LS -$26,092.89 0.00% -$26,092.89 ($26,092.89)
Net Increase (Decrease) 2 $18,836.61
SUPPORT DOCUMENTS INCLUDED:
CONTRACT TIME IMPACT: _______________________________ (N/A)
REVISED SCHEDULE PROVIDED? YES or NO
STANDARD SUDAS BID ITEMS MUST BE USED IF POSSIBLE, OTHERWISE PROVIDE COST BREAKDOWN:
INVOICES (REQUIRED):
MATERIAL SUBMITTALS (REQUIRED):
ADDITIONAL SUPPORT DOCUMENTS INCLUDED:
This document does not change the Contract Price or Contract Time but is evidence that the parties expect that the subject changes will be incorporated into a subsequent Contract
Change Order following negotiation by the parties as to effect, if any, upon Contract Price or Contract Time. Work shall not be deemed acknowledged per Division 1, General
Provisions and Covenants until all signatures are received. Payment related to this document will only be made after execution of Contract Change Order through City Council.
Sources
- revize: Attachment (GTWEA66BbcPIQjxDCA109eNbUYx4vk.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (K-2 - Change Order #9 - Original Town Phase 3.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: Discussion and Consideration of Change Order #9 – Rathje Construction, Original Town...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.