Page 96 of 105

Text from the PDF text layer; check the PDF for anything that matters.
Progress Photos Grid Line A footing formed Grid Line A footing poured Grid Line 11 footing pour Grid Line F footing formed Elevator walls and locker room footings Grid Line A and front stoop footing poured formed Owner Progress Report | 250120 October 2025 Miron Construction Co., Inc. | 11

Sources

  • revize: Agenda packet (packet_2025-11-18_96752af3-3060-4151-a4c4-baffb8e2576a.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 19, 2026. Built from the archive's documents; see how the data is built.