Page 93 of 105

Text from the PDF text layer; check the PDF for anything that matters.
Construction Summary Schedule Update Scheduled October Activities: Scheduled November Activities: • Footings (100%) • Erection of pre-engineered metal building • Foundation walls (95%) • Underground electrical • Foundation backfill (80%) • Underground plumbing • Exterior storm piping (75%) • Stoop walls and topping slabs • Elevator shaft (100% complete as of 11/5) • Additional water main work (ASI-04) Manpower Report List of major subcontractors & number of employees onsite: Total number of employees: 25 • Cedar Valley Steel - 2 • Freeman Construction - 2 • Miron Concrete - 8 • Miron Construction Manager - 2 • Seehase Masonry - 7 • SG Construction – 2 • Schrader Excavating & Grading Co – 2 Delays • Weather – See Daily Log Weather Report ‒ 1 rain day in October Weather Delays (Construction) Scheduled Occurred Left 12 1 11 • Materials & Labor ‒ None at this time Key Issues / Concerns & Recommended Action Steps • Inspections for rebar and concrete during foundation work • Coordination of openings in CMU Deliver unmatched quality, create meaningful connections, and craft unforgettable experiences in everything we do. Capture what truly matters and find ways to inspire. Owner Progress Report | 250120 October 2025 Miron Construction Co., Inc. |8

Sources

  • revize: Agenda packet (packet_2025-11-18_96752af3-3060-4151-a4c4-baffb8e2576a.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 19, 2026. Built from the archive's documents; see how the data is built.