Discussion and Consideration of L.L. Pelling Quote for Asphalt work in the Parking Lot of the Jim Bartels City Park and Council Action as Needed
Page 1 of 1
Text from the PDF text layer; check the PDF for anything that matters. Agenda Item: K-5
PROPOSAL
City of Tiffin
LL PELLIiIG CO.
Attn: Doug Boldt
300 Railroad Street
Tiffin, IA 52340
WWW.LLPELLING.COM '1425 W. Penn Street PO. Box 230 North Liberty, lowa 523'17 (319) 626{600 FAX (319) 6264605
WE PFOPOSE TO DO THE FOLLOWING WOBK AND/OR FURNISH THE MATERIALS AT THE UNIT PRICE QUOTED BELOW
Project Fire Dept 2025 November 6, 2025
The L.L. Pelling company proposes to do the following: Remove existing soil and place 6" of
subbase stone. Paving will consist of laying down 3" ofhot mix asphalt base material and compact
then apply a tack coat and 2" ofhot mix asphalt surface mix and compact and roll smooth. Two areas
at park as discussed with Doug.
ITEM DESCRIPTION
I Removals
QUANTITY
244.000
UNIT
SY
UNIT PRICE
$ 1s.30
AMOUNT
II Supplemental Stone 85.000 TON $41.85
$3,733.20
$3,557.2s
rI 5" HMA 244.000 SY $49.30 $12,029.20
II Bid Total: $19,319.65
Notes:
1 Final measurement will prevail.
2 Supplemental stone may vary and will be charged by the ton
Authorized
Signature
Note: This proposal may be withdra il not accepted within days.
All work & materials will be acmrding to specifications submfied or p€r standard practices. Any alteralion or de\,/iation from the abo/e specificalions
imoMng o(tra cost will become an extra charge o\€r and abo€ the estimate. ltems bid per Unit ot Measure are based on eslimated quantities, and
pryrnent will be based on aslual quadilies phced. Payrnont is due upori receipt of irNrri;e, I 3y4% SeMce Fee will be charyed on all past due
acmunts (2'lolo per annum). Arry opense inqlned to collect past due accounts, induding attofit€y tees, will be reimfursed by o,vner.
Acceptance of Ploposal The above prices, specifications and Signaturc-
conditions are satislactory and hereby accepted. You are authorized
Dat6-
lo do the work as specilied. Paymeni will be due upon receipt of
invoice. I will relain the white copy lor my records and retum the Sign Date
yellow copy lor authorization to schedule work.
"Committed to Excellence since 1948"
Sources
- revize: Attachment (PtjsIfUiztfosaOGmmqXyje2LXSoSU.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (K-5 - Pelling Quote for work at City Park - 2025.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-5 Discussion and Consideration of L.L. Pelling Quote for Asphalt work in the Parking Lot...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.