packet
Packet: Tiffin Regular City Council Meeting (12/02/2025)
Dated December 2, 2025City Council — regular meeting, December 2, 2025 160 pages
Ord. 2025-522, Ord. 2025-523, Res. 2025-089, Res. 2025-090, Res. 2025-091
Page 39 of 160
Text from the PDF text layer; check the PDF for anything that matters. AGENDA ITEM # G-2, H-2
AGENDA INFORMATION
TIFFIN CITY COUNCIL COMMUNICATION
DATE: November 24, 2025
AGENDA ITEM: Ordinance 2025-523 – Grove Park Rowhomes OPD & Rezoning
Approval
ACTION:
Request
Applicant: Pace Construction, LLC - 1321 Sunset Street, Suite 1, Iowa City, IA 52246
The applicant requests rezoning of Lot 30, Tiffin East (approx. 5.86 acres) from OPD/R-12
(Planned Development Overlay – Multi-Family 12-Plex Residential) and OPD/C-1B (Planned
Development Overlay – Mixed Use Commercial) To OPD/R-4 (Planned Development Overlay –
Multi-Family 4-Plex Residential) to allow development of Grove Park Rowhomes, a residential
project consisting of 56 attached units in 4-, 5-, and 6-plex buildings.
Property Information
• Location: East Marengo Road / Hwy 6, Tiffin, Iowa
• Size: 5.86 acres
• Current Zoning: OPD/R-12 and OPD/C-1B
• Proposed Zoning: OPD/R-4
• Surrounding Uses:
o West: Duplex residential
o East: Commercial lots
o South: Townhomes and condominiums
Project Description
• Total Units: 56 rowhome units (184 bedrooms)
• Building Types:
o Type A: 4-bedroom units with detached garages
o Type B & C: 3-bedroom units with front-loaded garages
• Parking:
o Required: 198 spaces (1 per bedroom + 1 per 4 units)
o Provided: 212 spaces (garage + driveway + guest)
• Open Space: 0.29 acres + public sidewalk along Hwy 6 connecting to Jim Bartels City
Park
• Phasing:
o Phase 1: 9 units + stormwater basin + initial utilities
o Phase 2: 19 units + looped water main + emergency access
o Phase 3: 15 units + east alley
o Phase 4: 13 units + final street connections
1
Sources
- revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.