packet
Packet: Tiffin Regular City Council Meeting (12/02/2025)
Dated December 2, 2025City Council — regular meeting, December 2, 2025 160 pages
Ord. 2025-522, Ord. 2025-523, Res. 2025-089, Res. 2025-090, Res. 2025-091
Page 142 of 160
Text from the PDF text layer; check the PDF for anything that matters. Miron Construction Co., Inc.
CONTINUATION SHEET AIA DOCUMENT G703
Page: 3
AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing
Contractor's signed Certification is attached. APPLICATION NUMBER: 7
In tabulation below, amounts are stated to the nearest cent. APPLICATION DATE: 11/24/2025 INVOICE NO.:
Use Column I on Contracts where variable retainage for line items may apply. PERIOD TO: 11/30/2025 250120-0007
PROJECT NO: 250120
A B C D E F G H I
SCHEDULED VALUE WORK COMPLETED (D+E)
TOTAL
MATERIAL
FROM COMPLETED PER- BALANCE
ITEM NO. DESCRIPTION OF WORK CHANGE PRESENTLY RETAINAGE
ORIGINAL CURRENT PREVIOUS THIS PERIOD AND STORED %(GIC) TO FINISH
ORDERS STORED
APPLICATION TO DATE
110 Metal Building Systems 1,997,300.00 24,775.83 2,022,075.83 1,315,457.80 0.00 0.00 1,315,457.80 65 706,618.03 65,772.89
115 Elevators 122,000.00 0.00 122,000.00 0.00 0.00 0.00 0.00 0 122,000.0C 0.00
120 Fire Suppression 204,120.00 -46,930.90 157,189.10 0.00 0.00 0.00 0.00 0 157,189.1€ 0.00
125 Plumbing 383,200.00 -61,603.00 321,597.00 0.00 41,925.00 0.00 41,925.00 13 279,672.0( 2,096.25
130 HVAC 935,847.00 -215,897.00 719,950.00 0.00 9,775.00 0.00 9,775.00 1 710,175.0 488.75
135 Electrical 823,355.00 -116,071.79 707.,283.21 16.693.88 59,470.00 0.00 76,163.88 11 631,119.3? 3,808.19
140 Earthwork 315,386.00 11,601.70 326,987.70 224,440.85 60,660.59 0.00 285,101.44 87 41,886.2€ 14,255.07
145 Aggregate Piers 135,379.00 0.00 135,379.00 135,379.00 0.00 0.00 135,379.00 100 0.0( 6,768.95
150 Asphalt Paving 169,606.00 0.00 169,606.00 0.00 0.00 0.00 0.00 0 169,606.0 0.00
155 Concrete Site Work 82,800.00 0.00 82,800.00 0.00 0.00 0.00 0.00 0 82,800.0( 0.00
160 Athletic Turf Surfacing 45,000.00 -5,500.00 39,500.00 0.00 0.00 0.00 0.00 0 39,500.00 0.00
165 Site Utilities 64,708.00 75,782.88 140,490.88 50,179.18 87,221.20 0.00 137,400.38 98 3,090.50 6,870.02
166 Landscaping 0.00 97,075.00 97,075.00 18,860.00 1,500.00 0.00 20,360.00 21 76,715.00 1,018.00
170 Testing & Inspections Allowance 40,000.00 0.00 40,000.00 3,470.25 3,331.50 0.00 6,801.75 17 33,198.25 340.09
175 New Utility Services Allowance 40,000.00 -14,543.95 25,456.05 2,610.12 0.00 0.00 2,610.12 10 22,845.93 130.51
180 Mill & Overlay N Parking Lot Allowance 101,000.00 0.00 101,000.00 0.00 0.00 0.00 0.00 0 101,000.0C 0.00
185 Flood Insurance Deductible Allowance 25,000.00 0.00 25,000.00 0.00 0.00 0.00 0.00 0 25,000.0C 0.00
190 CMU Enhancements Allowance 35,000.00 -35,000.00 0.00 0.00 0.00 0.00 0.00 0 0.0C 0.00
195 Lobby Alternate Ceiling Allowance 45,000.00 -45,000.00 0.00 0.00 0.00 0.00 0.00 0 0.0C 0.00
200 Data Cabling & Backbone Allowance 250,000.00 -250,000.00 0.00 0.00 0.00 0.00 0.00 0 0.0C 0.00
205 Access Control Allowance 34,000.00 0.00 34,000.00 0.00 0.00 0.00 0.00 0 34,000.0C 0.00
210 CCTV Allowance 45,000.00 0.00 45,000.00 0.00 0.00 0.00 0.00 0 45,000.0Cc 0.00
Sheets in this document
- p. 22 Concept Design · Streamline Architects · Tiffin Events Center
- p. 23 Concept Design · Streamline Architects · Tiffin Events Center
- p. 24 Concept Design · Streamline Architects · Tiffin Events Center
- p. 25 Concept Design · Streamline Architects · Tiffin Events Center
- p. 26 Concept Design · Streamline Architects · Tiffin Events Center
- p. 27 Concept Design · Streamline Architects · Tiffin Events Center
- p. 28 Concept Design · Streamline Architects · Tiffin Events Center
- p. 29 Concept Design · Gallant Design
- p. 30 Concept Design | Tiffin Events Center · Streamline Architects
- p. 31 Concept Design · Streamline Architects · Tiffin Events Center
- p. 32 Concept Design · Streamline Architects · Tiffin Events Center
- p. 33 Concept Design · Gallant Design
- p. 34 Concept Design · Streamline Architects · Tiffin Events Center
- p. 35 Floor Plan
- p. 36 C120 · General Notes and Details · MMS Consultants
- p. 45 A.200 · South Elevation
- p. 46 Floor Plan
- p. 47 Floor Plan · Basement
- p. 48 A.200 · South Elevation
- p. 49 A.201 · North Elevation
- p. 50 Floor Plan · Level 2
- p. 51 A.200 · Building Elevations
- p. 52 Floor Plans
- p. 53 C200 · Site Layout · Iowa DOT
- p. 54 C300 · Site Utilities Plan
- p. 55 C301 · Site Utilities Plan
- p. 56 Revised Site P
- p. 57 Preliminary Plat
- p. 58 2 · Road Typical Section
- p. 59 3 · Revised Phasing & Utility Layout
- p. 71 Concept Design · Streamline Architects · Tiffin Events Center
- p. 72 Concept Design · Streamline Architects · Tiffin Events Center
- p. 73 Concept Design · Streamline Architects · Tiffin Events Center
- p. 74 Concept Design · Streamline Architects · Tiffin Events Center
- p. 75 Concept Design · Streamline Architects · Tiffin Events Center
- p. 76 Concept Design · Streamline Architects · Tiffin Events Center
- p. 77 Concept Design · Streamline Architects · Tiffin Events Center
- p. 78 Concept Design · Gallant Design
- p. 79 Concept Design | Tiffin Events Center · Streamline Architects
- p. 80 Concept Design · Streamline Architects · Tiffin Events Center
- p. 81 Concept Design · Streamline Architects · Tiffin Events Center
- p. 82 Concept Design · Gallant Design
- p. 83 Concept Design · Streamline Architects · Tiffin Events Center
- p. 84 Floor Plan
- p. 85 C120 · General Notes and Details · MMS Consultants
- p. 94 A.200 · South Elevation
- p. 95 Floor Plan
- p. 96 Floor Plan · Basement
- p. 97 A.200 · South Elevation
- p. 98 A.201 · North Elevation
- p. 99 Floor Plans
- p. 100 A.200 · Building Elevations
- p. 101 Floor Plans
- p. 102 C200 · Site Layout · Iowa DOT
- p. 103 C300 · Site Utilities Plan
- p. 104 C301 · Site Utilities South
- p. 105 Revised Site Plan
- p. 106 Preliminary Plat
- p. 107 2 · Road Typical Section
- p. 108 3 · Address City Comments Revised Phasing & Utility Layout
Sources
- revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.