contract agreement · K-5
Discussion and Consideration of Pay Application #1 – Courts for Sports, Sand Volleyball Courts Project – Motion to Approve
Page 2 of 2
Text from the PDF text layer; check the PDF for anything that matters. Final Invoice #111925
Sand Vball Court(s)
PREPARED FOR: City of Tiffin
Address: Date: 6/24/2025
City / State / Zip: Tiffin, IA
email: [email protected]
[email protected] Game Tile Estimated Phone: 612.206.4342
Goal Side Width: Revised
Length: Option 1 Option 2 Option 3
72' x 46' area 72' x 46' area 82' 6" x 56' 3"' area
TYPE SURFACE: Outdoor Sand Volleyball Sand Volleyball Sand Volleyball
1. SITE PREPARATION: Game Court Court Court
Tree Removal Fill Hauled Out
x Leveling x Fill Hauled In 52' 6" x 26' 3" 52' 6" x 26' 3" 59' x 29' 6"
x Fine Grading Fence Removal court court court
*Other: 1 Vball Court 2 Vball Courts 2 Vball Courts
Full Installation Full Installation Full Installation
2. CONCRETE WORK:
4" approx thickness 4,000 p.s.i Approx 1" on 10' slope $0 $0 $0
x fiberglass rebar Hole concrete $100 min $450 $450 $450 $450
Hole charge $150 $300 $600 $600
CONCRETE PUMP: Distance Sono Tube - 24" x 3' deep $50 Pump Truck $100 $200 $200
Buggy
SUBTOTAL $850 $1,250 $1,250
3. COMPONENTS: Type: Price:
Painted Court lines Pickleball ( $550 ), Bball ( $650 )
x Gravel Clean Rock for drainage - 3" $30 / ton $1,620 $3,240 $4,500
x Sand Est 12-16" deep #0810 sand $6,000 $12,000 $25,900
x Hardware Sleeves, 4" square aluminum poles, net, line markers, pole pads $2,800 + freight $2,800 $5,600 $5,600
Buggy Rental Required to pour and minimize ingress / egress ground disturbance.
Bball Hoop 60" glass. 6-10' adjustable. Break away rim
Hoop pads Pole pad / Board pad
Bball Hoop 72" glass. 6-10' adjustable. Break away rim
x Weed barrier Between rock and sand $490 $490 $980 $1,372
x Finger Drains Perforated tile under the court for drainage. $900 $900 $1,800 $2,520
Rebounder 10' x 20'. Concrete. Full Installation
x Machine Hrs Digging out dirt. Spreading sand. Trucking $4,500 $8,500 $11,972
Hoop Install Auger, Set anchor, Assemble, Install.
Component/Surface Total $16,310 $32,120 $51,864
4. Extra charges will apply if service requested:
x Black dirt / Sod around court. May be able to coordinate this. NOT included.
x Minor dirt landscaping around court. Compost, Seed, Fert pellets. May be able to coordinate this. NOT included.
x Mobilization billed @ $1.00/mile. miles round trip. truck trips $0
Extra Labor for misc billed @ $75 / $45 hour.
x Repair Ingress / Egress - compost, seed , fert, pellets. NOT included.
x In Iowa, Dial 811. Utility locates will need to be done before digging. Could alter costs if issues.
SUBTOTAL $17,160 $33,370 $53,114
Est Freight $300 $600 $600
SUBTOTAL $17,460 $33,970 $53,714
Customer Signature Date Extra's $0 $0 $0
Tax n/a n/a n/a
Courts Fore Sports Date Deduct till Spring -$2,000
2026 Final Billing
after net install/seeding
TOTAL $17,460 $33,970 $51,714
Option: XX
Standard terms are 50% deposit, remainder at completion. Negotiable. Payment Schedule Courts Fore Sports
Jason Miller
No Credit Cards please. Total $51,714 4218 V Street
Deposit Paid $0 Homestead, IA 52236
Balance Due $51,714 319.531.0066
Thank you for the opportunity - we appreciate your business!! [email protected]
Sources
- revize: Attachment (QnKoMmaC20thd3KUwTJ2Wj0Szr8t2f.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (K-5 - Pay Application #1 - Courts for Sports - Sand Volleyball Courts.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-5 Discussion and Consideration of Pay Application #1 – Courts for Sports, Sand...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.