city code

Chapter 160 – Flood Plain Regulations

12 pages

Open the PDF

Page 4 of 12

Text from the PDF text layer; check the PDF for anything that matters.
site, such as pouring of a slab or footings, the installation of pile, the construction of columns, or any work beyond the stage of excavation; or the placement of a factory-built home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of the building, whether or not that alteration affects the external dimensions of the building. 25. “Structure” means anything constructed or erected on the ground or attached to the ground, including, but not limited to, buildings, factories, sheds, cabins, factory-built homes, storage tanks, and other similar uses. 26. “Substantial damage” means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damage condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. 27. “Substantial improvement” means any improvement to a structure which satisfies either of the following criteria: A. Any repair, reconstruction, or improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure either: (i) before the “start of construction” of the improvement, or (ii) if the structure has been “substantially damaged” and is being restored, before the damage occurred. The term does not, however, include any project for improvement of a structure to comply with existing State or local health, sanitary, or safety code specifications which are solely necessary to assure safe conditions for the existing use. The term also does not include any alteration of an “historic structure,” provided the alteration will not preclude the structure’s designation as an “historic structure.” B. Any addition which increases the original floor area of a building by 25 percent or more. All additions constructed after the effective date of the Flood Insurance Rate Map shall be added to any proposed addition in determining whether the total increase in original floor space would exceed 25 percent. 28. “Variance” means a grant of relief by a community from the terms of the flood plain management regulations. 29. “Violation” means the failure of a structure or other development to be fully compliant with this chapter. 160.03 LANDS TO WHICH CHAPTER APPLIES. The provisions of this chapter shall apply to all lands and uses which have significant flood hazards. The Flood Boundary and Floodway Map and the Flood Insurance Rate Map (FIRM) Panels 154, 158, 159, 160, 166, and 167, dated February 16, 2007, which were prepared as part of the Flood Insurance Study for Johnson County and the City, shall be used to identify such flood hazard areas and all areas shown thereon to be within the boundaries of the 100- year flood shall be considered as having significant flood hazards. Where uncertainty exists with respect to the precise location of the 100-year flood boundary, the location shall be determined on the basis of the 100-year flood elevation at the particular site in question. The Flood Insurance Study is hereby adopted by reference and is made a part of this chapter for the purpose of administering flood plain management regulations.

Sources

  • citycode: Chapter 160 – Flood Plain Regulations (chapter-160.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.