Page 2 of 4
Text from the PDF text layer; check the PDF for anything that matters. 6. “Portland cement” means any type of cement except bituminous cement.
7. “Sidewalk” means all permanent public walks in business, residential or suburban areas.
8. “Sidewalk improvements” means the construction, reconstruction, repair, replacement, or
removal, of a public sidewalk and/or the excavating, filling or depositing of material in the public
right-of-way in connection therewith.
9. “Wood float finish” means a sidewalk finish that is made by smoothing the surface of the
sidewalk with a wooden trowel.
136.03 REMOVAL OF SNOW, ICE, AND ACCUMULATIONS. It is the responsibility of the
abutting property owners to remove snow, ice, and accumulations promptly from sidewalks. If a property
owner does not remove snow, ice, or accumulations within a reasonable time, the City may do so and
assess the costs against the property owner for collection in the same manner as a property tax.
(Code of Iowa, Sec. 364.12[2b & e])
136.04 RESPONSIBILITY FOR MAINTENANCE. It is the responsibility of the abutting property
owners to repair, replace or reconstruct, or cause to be repaired, replaced or reconstructed, all broken or
defective sidewalks and to maintain in a safe and hazard-free condition any sidewalk outside the lot and
property lines and inside the curb lines or traveled portion of the public street.
(Code of Iowa, Sec. 364.12[2c])
136.05 CITY MAY ORDER REPAIRS. If the abutting property owner does not maintain sidewalks
as required, the Council may serve notice on such owner, by certified mail, requiring the owner to repair,
replace or reconstruct sidewalks within a reasonable time and if such action is not completed within the
time stated in the notice, the Council may require the work to be done and assess the costs against the
abutting property for collection in the same manner as a property tax.
(Code of Iowa, Sec. 364.12[2d & e])
136.06 SIDEWALK CONSTRUCTION ORDERED. The Council may order the construction of
permanent sidewalks upon any right-of-way in the City and may specially assess the cost of such
improvement to abutting property owners in accordance with the provisions of Chapter 384 of the Code of
Iowa. However, when pertaining to subdivision sidewalk improvement installations, the following shall
apply: The City shall not order any owner or subdivider to construct permanent sidewalks upon any
right-of-way for a period of up to one year from the approval of the final subdivision plat or not before
such time as the owner or subdivider has sold 75 percent of the lots in the subdivision, whichever may
occur first. This shall not exempt the subdivider or owner from any requirements of the Subdivision
Ordinance, including (but not limited to) any requirement of a surety bond or escrow agreement or
requirements involved with the transference of a lot without constructing improvements.
(Code of Iowa, Sec. 384.38)
136.07 PERMIT REQUIRED. No person shall remove, reconstruct, or install a sidewalk unless such
person has obtained a permit from the City and has agreed in writing that said removal, reconstruction, or
installation will comply with all ordinances and requirements of the City for such work.
136.08 SIDEWALK STANDARDS. Sidewalks repaired, replaced, or constructed under the provisions
of this chapter shall be constructed in accordance with the City Design Standards.
136.09 BARRICADES AND WARNING LIGHTS. Whenever any material of any kind is deposited
on any street, avenue, highway, passageway or alley when sidewalk improvements are being made or
when any sidewalk is in a dangerous condition, it shall be the duty of all persons having an interest
therein, either as the contractor or the owner, agent, or lessee of the property in front of or along which
Sources
- citycode: Chapter 136 – Sidewalk Regulations (chapter-136.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.