Page 4 of 4
Text from the PDF text layer; check the PDF for anything that matters.Public Health Association, and shall be determined at the control manhole provided, or upon suitable
samples taken at said control manhole. In the event that no special manhole has been required, the control
manhole shall be considered to be the nearest downstream manhole in the public sewer to the point at
which the building sewer is connected. Sampling shall be carried out by customarily accepted methods to
reflect the effect of constituents upon the sewage works and to determine the existence of hazards to life,
limb, and property. (The particular analyses involved will determine whether a 24-hour composite of all
outfalls of a premises is appropriate or whether a grab sample or samples should be taken. Normally, but
not always, B.O.D. and suspended solids analyses are obtained from 24-hour composites of all outfalls
whereas pH’s are determined from periodic grab samples).
Sources
- citycode: Chapter 97 – Use Of Public Sewers (chapter-97.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.