city code

Chapter 96 – Building Sewers And Connections

1 page

Open the PDF

Page 1 of 1

Text from the PDF text layer; check the PDF for anything that matters.
CHAPTER 96 BUILDING SEWERS AND CONNECTIONS 96.01 Permit 96.05 Excavations 96.02 Plumber Required 96.06 Inspection Required 96.03 Connection Requirements 96.07 Property Owner’s Responsibility 96.04 Sewer Tap 96.08 Abatement of Violations 96.01 PERMIT. No unauthorized person shall uncover, make any connection with or opening into, use, alter, or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the City. The application for the permit shall set forth the location and description of the property to be connected with the sewer system and the purpose for which the sewer is to be used, and shall be supplemented by any plans, specifications, or other information considered pertinent. The permit shall require the owner to complete construction and connection of the building sewer to the public sewer within sixty (60) days after the issuance of the permit, except that when a property owner makes sufficient showing that due to conditions beyond the owner’s control or peculiar hardship, such time period is inequitable or unfair, an extension of time within which to comply with the provisions herein may be granted. Any sewer connection permit may be revoked at any time for a violation of these chapters. 96.02 PLUMBER REQUIRED. The person who makes the application shall pay a fee in the amount of $200.00 to the Clerk. 96.03 CONNECTION REQUIREMENTS. The installation of the building sewer and its connection to the public sewer shall conform to the requirements of the International Plumbing Code, the laws of the State and other applicable rules and regulations of the City, including the City Design Standards. 96.04 SEWER TAP. Connection of the building sewer into the public sewer shall be made at the “Y” branch, if such branch is available at a suitable location. If no properly located “Y” branch is available, a saddle “Y” shall be installed at the location specified by the Superintendent. The public sewer shall be tapped with a tapping machine and a saddle appropriate to the type of public sewer shall be glued or attached with a gasket and stainless steel clamps to the sewer. At no time shall a building sewer be constructed so as to enter a manhole unless special written permission is received from the Superintendent and in accordance with the Superintendent’s direction if such connection is approved. 96.05 EXCAVATIONS. All trench work, excavation, and backfilling required in making a connection shall be performed in accordance with the provisions of the International Plumbing Code and the provisions of Chapter 135 of this Code of Ordinances. 96.06 INSPECTION REQUIRED. No building sewer shall be covered, concealed, or put into use until it has been tested, inspected and accepted as prescribed in the International Plumbing Code. 96.07 PROPERTY OWNER’S RESPONSIBILITY. All costs and expenses incident to the installation, connection, and maintenance of the building sewer shall be borne by the owner. The owner shall indemnify the City from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer. 96.08 ABATEMENT OF VIOLATIONS. Building sewers, whether located upon the private property of any owner or in the public right-of-way, which are constructed or maintained in violation of any of the requirements of this chapter shall be deemed a nuisance and the same shall be abated by the City in the manner provided for the abatement of nuisances. (Code of Iowa, Sec. 364.12[3])

Sources

  • citycode: Chapter 96 – Building Sewers And Connections (Chapter-96-BUILDING-SEWERS-AND-CONNECTIONS.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.