Page 5 of 25
Text read by OCR; check the PDF for anything that matters. Top View
Concrete Pad Detail
eo)
Ory Hydrant —o
S)
4"
6" NFT Male
‘ey — 4
TTM~ concrete Post LL Concrete Post
i re} (Typical)
or as per hire ief"
2
i
Concrete Pad Water in riser remain
See Detail this Sheet below frost during hi: ater.
x...) = High water level
6" Schedule 40 PVC Pipe a
Low water level
4'-5' Below Low
45°
2-45° Elbows
F
+ 16-20" piece of pipe makes Water Level
Y
Elbow up the wide sweep angle here
Elbow = il Seseegasasa
45° an 20000000000
Si Q0D00000000
Screen slightly off the bottom
FIGURE = 2G—1.02
Use this method only if the bank is so steep such that the backhoe cannot reach
deep enough to maintain a level trench cut to the riser or if there is a long .
uphill run. The idea is to maintain a 5’ deep trench cut, from the top of the Top View
ground, to the riser. installer must determine the correct angles for
installation of the hydrant. — Pad =O
Dry Hydrent —+ S
s
4
6” NFT Male
. 4 iF
— &—F
~~ Concrete Post \_ Concrete Post
Oo (Typical
or as = Chief”
Concrete Pad Water in riser remain
See Detail this Sheet below frost during high-water.
~~] _ High water level
6" Schedule 40 PVC Pipe _
Angle Low water level
4-5" Below Low
Water Level
Anoka | \_ i Bs
Hi S888Saen005
Screen slightly off the bottom
FIGURE 2G—1.03
Sources
- citycode: 2019 Design Standards Amendments (2019-Design-Standards-Amendments.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.