Text from the PDF text layer; check the PDF for anything that matters. 2. The additional driveway is warranted by a traffic study.
3. Concurrence by the Jurisdictional Engineer.
Driveway access points should be coordinated to minimize turning conflicts.
C. Local Roadway
The minimum distance between the centerlines of roadway access points is 125-feet. A single
driveway access shall be allowed for each lot abutting a local roadway. One additional driveway access
may be permitted if the lot has frontage length greater than150-feet. Concurrence of the Jurisdictional
Engineer s required.
D. Industrial Roadway
The minimum distance between the centerlines of roadway access points is 125-feet. A single
driveway access shall be allowed for each lot abutting an industrial roadway. Additional driveway
access point may be permitted based on projected traffic and concurrence of the Jurisdictional
Engineer.
5L-4 A Add the following paragraphs to 5L-4 A:
All entrances in urban settings should be paved to prevent aggregate from washing onto the pavement,
curb, and gutters. If the existing drive is not paved, pave the first 10 feet from the back of curb or to the
edge of the existing sidewalk.
All entrances should be constructed so as not to impair drainage within the highway right-of-way nor
alter the stability of the highway subgrade and at the same time not impair or materially alter drainage
of the adjacent areas. All culverts, catch basins, drainage channels, and other drainage structures
required under driveways as the result of property being developed should be installed in accordance
with current standards and specifications.
5L-4.H Add the following paragraphs as 5L-4.H:
5L-4.H. Other Jurisdictional Requirements
1. Approvals and Permits
A. An access permit must be obtained before driveway construction or reconstruction work is done
within the street right-of-way not associated with the construction of a new house or business for
which a building permit has been obtained. However, the standards set forth in this document apply
to all driveway construction. A sketch with dimensions shall be submitted showing the driveway in
relation to intersections, side lot lines and other driveways.
B. A permit must be obtained from the Iowa Department of Transportation before placing or
modifying a driveway within any state highway right-of-way.
C. Contractor must provide a Certificate of Insurance identifying the City as an “Additional Insured”
party for the duration of the construction activity.
2. Traffic Control
A. The contractor doing the work is responsible for all traffic control and work site safety. If
construction activities extend onto the street right-of-way, traffic control shall meet the standards for
Work Zone Traffic Control defined in the current edition of the “Manual on Uniform Traffic Control
Devices.” Traffic control plans may be required.
B. The contractor shall provide adequate barricades and/or fencing to protect pedestrians
continuously from the start of construction to the completion of work.
3. Driveway Material, Thickness and Finish
A. In Residential Zoning the driveway slab extending from the street to private property shall be
constructed of Portland Cement Concrete conforming to the specifications of the Iowa Department
of Transportation C-3 or M-3 mixes. The concrete driveway slab shall be a minimum of 6-inches
thick.
12